5050 Capitol Ave
Dallas, TX 75206
Foundation stabilization permitted at 5050 Capitol Ave
A City of Dallas permit filed August 25, 2026, covers installing exterior piers to stabilize the foundation at 5050 Capitol Ave. The record does not describe a new building or identify an occupant.
Summarized from City of Dallas records · updated Aug 25, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 25, 2026
- since Aug 25, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5050 Capitol Ave
What is being built at 5050 Capitol Ave in Dallas?
The permit describes foundation stabilization, not a new building: exterior piers will be installed to stabilize the foundation. The City of Dallas filed permit COM-FDN-26-000115 on August 25, 2026.
What work is planned at 5050 Capitol Ave?
The permitted work is installation of exterior piers to stabilize the foundation. The record does not provide a project size or valuation.
When was the 5050 Capitol Ave permit filed?
The City of Dallas permit was filed on August 25, 2026. Its number is COM-FDN-26-000115.
Is a new commercial building planned at 5050 Capitol Ave?
The available permit record does not indicate a new building. It covers exterior piers for foundation stabilization.
What is happening near Voro on Fitzhugh Avenue?
At 5050 Capitol Ave, about 243 meters from Voro at 2500 Fitzhugh Ave, a City of Dallas permit covers installing exterior foundation piers. The permit was filed August 25, 2026.
Also being built nearby
All of 75206- 5025 Capitol Ave · Belmont Bennett Avenue LLCJul 9, 2024Camden belmont apartments exterior repairs - dallas, tx — renovation/alteration — camden belmont building f, reskin, reroof, repaint, balcony replacement, and interior reposition · 33 m away
- 2450 N Garrett AveSep 1, 2026No work service request · 108 m away
- 2500 Bennett AveJun 18, 2026Install (4) (customer supplied) level two charging stations. (load share)inspect (2) existing 240v 40a circuits and copper conductors.install (2) 6"x6"x6" nema 3 junction boxes.install (40') of 3/4" conduits from junction boxes to stations 1-4 · 158 m away
- 2425 Thatcher DrJun 8, 202650 gal water heater · 160 m away
- 2408 Wild Cherry WayJun 30, 2025Replace 3 ton complete · 164 m away
- 2518 N Garrett AveMay 8, 20262518 n garrett - construct a 3-unit 3 story townhome. each unit is 1,885 sq ft · 196 m away
- 2408 N Fitzhugh AveDec 16, 2020Tpo installment over exist roof · 201 m away
- 5202 Capitol AveJun 18, 2026Replacing 3.5 ton heat pump · 201 m away
- 5205 Capitol AveAug 10, 2026Complete removal of existing tpo and insulation to existing deck. installation of self-adhering tpo roofing system, polyiso insulation, tpo wrap scuppers, pipe boot, exhaust vent pipe, fixed self-flashing skylight, sheets of decking, coping metal cap. removal of roofing debris · 204 m away
- 5124 Belmont AveNov 11, 2025Insurance funded reroof · 205 m away
- 4934 Zuma CtJan 14, 2026Gas test · 207 m away
- 4963 Dartford DrOct 19, 20264 ton base furnace horizontal · 211 m away