3 Stonebriar Ct
Dallas, TX 75206
50-gallon gas water heater replacement at 3 Stonebriar Ct
A 50-gallon gas water heater is being replaced in the attic at 3 Stonebriar Ct. The City of Dallas permit was filed on December 11, 2025 (permit RES-PLM-25-008762).
Summarized from City of Dallas records · updated Dec 11, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 11, 2025
- since Dec 11, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3 Stonebriar Ct
What work is permitted at 3 Stonebriar Ct?
A City of Dallas residential plumbing permit covers replacing a 50-gallon gas water heater in the attic. The permit was filed on December 11, 2025.
Is a new water heater being installed at 3 Stonebriar Ct?
The permit description says a 50-gallon gas water heater will be swapped out. It does not provide a separate installation date.
What is the permit number for the work at 3 Stonebriar Ct?
The permit number is RES-PLM-25-008762. The City of Dallas filed it on December 11, 2025.
When was the water heater permit filed at 3 Stonebriar Ct?
The City of Dallas permit was filed on December 11, 2025. It covers a 50-gallon gas water heater replacement in the attic.
What's happening near Trader Joe's on Greenville Avenue?
At 3 Stonebriar Ct, about 130 meters from Trader Joe's at 2001 Greenville Avenue, a permit covers replacing a 50-gallon gas water heater in the attic. The permit was filed on December 11, 2025.
Also being built nearby
All of 75206- 13 Stonebriar CtMay 14, 2025Replace 2 ton complete hvac · 7 m away
- 5728 Prospect AveDec 4, 2025Electrical service release for new txu account to exisitng tenant · 34 m away
- 5736 Prospect AveAug 19, 2026Removing approximately 81 lf of brick screen wall and rebuilding. the plan will utilize the same footer in all spots except for a 24 lf repour · 41 m away
- 5743 Prospect AveJun 25, 2025Gas leak gas riser · 49 m away
- 2100 Greenville Avenue · Greenville 2100 LtdMar 6, 2026Fonda toro — renovation/alteration — interior finish out · 93 m away
- 2100 Greenville AveMay 28, 2026Install receptacles and light fixtures · 93 m away
- 2026 Greenville AveDec 11, 2020Erect attached sign · 98 m away
- 2110 Greenville AveJul 1, 2025Repair the drainage system below building accessed through a tunnel · 98 m away
- 2114 Greenville AveSep 17, 2026Install new lighting and receptacle · 103 m away
- 2129 Greenville AveSep 18, 2025Remove approximately 40 to 45 feet of existing deteriorated sewer pipe and install new pvc pipe with cleanouts · 107 m away
- 2120 Greenville AveOct 7, 2025Replace existing 70lb grease trap · 114 m away
- 2010 Greenville AveOct 27, 2020Service release no work · 119 m away