5500 Greenville Ave
Dallas, TX 75206 · Flock & Fresh, Gen Korean Bbq House
Commercial renovation and equipment work at 5500 Greenville Ave
City of Dallas permits show commercial renovations and equipment work at 5500 Greenville Ave, with filings from June 13, 2025, through October 28, 2026. The records include work described as an interior remodel with a small patio, installation of kitchen hoods and a grease trap, and electrical work for Pilates and glute rooms. An October 28, 2026, electrical permit says the suite was vacant.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Oct 28, 2026
- Projects
- 41
- 41 filings
- Latest filing
- Oct 28, 2026
- since Sep 28, 2020
- Largest scope
- 2,719 sf
- Estimated cost
- $650K
- state registration
Permit & project history
41 projectsPilates room:-install mirror led strips and driver-install (1) switch with a dimmer for mirror lights on wall by mirrors. makeconnections.-install (2) switches a and b. this will control ½ of the ceiling lights per switch.-opposite wall, install a quad outlet connected to a 110v power source.-install 1 cut in box and run string from the ceiling to the bottom of the cut in box.glute room:-install mirror led strips-install (1) driver for the led mirror lights and back wall mill work in ceiling-install (1) switch with a dimmer for mirror lights on wall by mirrors. make connections.-install (2) switches a and b. this will control ½ of the ceiling lights per switch.-opposite wall you will need to install a quad outlet connected to a 110v power source. you can pull this power from any consistent power in the ceiling. outlet installed 40in from the ground.-install 1 cut in box next to the 110 outlet and run a string from the ceiling to the bottom of the cut inbox.-run and supply 3 outlets for tv’s-run and supply 3 data cut in rings with a string. you will install these right next to each t.v-run wire from the driver that is for the mirror led lights to the back wall and connect it to the mill work.3.50/50 room:- install switch to control 4 rows of lights
Pilates room:-install mirror led strips and driver-install (1) switch with a dimmer for mirror lights on wall by mirrors. makeconnections.-install (2) switches a and b. this will control ½ of the ceiling lights per switch.-opposite wall, install a quad outlet connected to a 110v power source.-install 1 cut in box and run string from the ceiling to the bottom of the cut in box.glute room:-install mirror led strips-install (1) driver for the led mirror lights and back wall mill work in ceiling-install (1) switch with a dimmer for mirror lights on wall by mirrors. make connections.-install (2) switches a and b. this will control ½ of the ceiling lights per switch.-opposite wall you will need to install a quad outlet connected to a 110v power source. you can pull this power from any consistent power in the ceiling. outlet installed 40in from the ground.-install 1 cut in box next to the 110 outlet and run a string from the ceiling to the bottom of the cut inbox.-run and supply 3 outlets for tv’s-run and supply 3 data cut in rings with a string. you will install these right next to each t.v-run wire from the driver that is for the mirror led lights to the back wall and connect it to the mill work.3.50/50 room:- install switch to control 4 rows of lights
City of Dallas permitCommercial Electrical PermitInstallation of a capative air unit with two fefs – roof is being enforced. crane will be on site
Installation of a capative air unit with two fefs – roof is being enforced. crane will be on site
City of Dallas permitCommercial Mechanical PermitGrease trap pump-outremove and properly dispose of all contents (grease, solids, and water) from the grease trap.pressure wash and clean interior surfaces to expose tank structure and components.visual inspection and assessmentexamine tank walls, lid, inlet/outlet tees or baffles, and overall structural condition.check for signs of corrosion, cracks, or missing/damaged components
Grease trap pump-outremove and properly dispose of all contents (grease, solids, and water) from the grease trap.pressure wash and clean interior surfaces to expose tank structure and components.visual inspection and assessmentexamine tank walls, lid, inlet/outlet tees or baffles, and overall structural condition.check for signs of corrosion, cracks, or missing/damaged components
City of Dallas permitCommercial Plumbing PermitQteam qr inhouse interior remodel with small patio. original columns to remain and not removed as shown on original plans. no foundation work required
Qteam qr inhouse interior remodel with small patio. original columns to remain and not removed as shown on original plans. no foundation work required
City of Dallas permitCommercial Alteration Addition PermitInterior remodel with small patio remodel — old town in the village
TDLR project registrationRenovation/AlterationReview Complete2,719 sq ft$650K est.- Project #
- TABS2025018694
- Tenant / owner
- Flock & Fresh
- Design firm
- Pro
- Contact
- Pro
Interior tenant improvement of existing single story restaurant. includes new non-bearing walls, casework, ceiling, lighting, finishes, cooking equipment and walk-in cooler/freezer. new restrooms with new plumbing fixtures and new finishes. new 3- — old town shopping center
TDLR project registrationRenovation/AlterationProject Closed4,417 sq ft$300K est.- Project #
- TABS2023012684
- Tenant / owner
- Gen Korean Bbq House
- Design firm
- Pro
- Contact
- Pro
+ 1 older projects. See the full history with a free trial.
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 5500 Greenville Ave
What is being built at 5500 Greenville Ave in Dallas?
City permits show commercial renovation and equipment work, including an interior remodel, kitchen hoods and a grease trap. The records do not identify a specific new business or opening.
Is a new gym opening at 5500 Greenville Ave?
Permits include electrical work for a Pilates room and a glute room, but the records do not confirm a new gym opening. An October 28, 2026, permit says the suite was vacant.
What renovations are planned at 5500 Greenville Ave?
A plumbing permit dated August 27, 2025, describes an interior remodel with a small patio. Other permits cover electrical work, HVAC replacement, kitchen hoods and a grease trap.
When were permits filed for 5500 Greenville Ave?
The records span June 13, 2025, to October 28, 2026. Recent filings include a washer box permit on October 14, 2026, and an electrical permit on October 28, 2026.
What does the latest permit for 5500 Greenville Ave cover?
The October 28, 2026, commercial electrical permit, COM-ELC-26-005332, is for cleaning and showing the space for meter release. Its description says the suite was vacant.
Is LA Fitness doing work at 5500 Greenville Ave?
A July 14, 2025, plumbing permit, COM-PLM-25-000773, describes a repair at the gas meter for LA Fitness. That permit does not establish other work or a new opening.
Also being built nearby
All of 75206- 5409 Greenville Ave · Greenville Ave Investment, LLCJan 16, 2025Alchemy wellness — renovation/alteration — 3120 sq ft of interior walls and doors, hvac, electrical and lighting, plumbing and 2 ada restrooms, ceiling tiles and grid · 121 m away
- 7550 N Central ExpyOct 15, 2026Correct existing electrical boxes and branch circuits by repairing connections, securing wiring and connectors, replacing missing covers, and addressing visible hazards to meet code · 181 m away
- 5302 Greenville AveMar 6, 2026Install (1) 10 row x 24' non-elevated bleacher and (1) 10 row x 36' non-elevated bleacher in parking lot for upcoming st. patrick's day parade. install will be on march 13th and dismantle will be on march 14, 2026. bleachers are modular style temporary bleachers designed specifically for special events · 241 m away
- 5315 Greenville AveDec 9, 2025Gas pressure test per atmos since unit was vacant for over 60 days · 253 m away
- 5312 Greenville AveDec 15, 2025Needing to get a permit to get power reinstated by oncor on the current meter. essid: 10443720008130535oncor # 888-313-6862 · 275 m away
- 5809 E Lovers Lane · Ot Chatsworth Texas LLCMar 4, 2025Tom thumb foodstore remodel — renovation/alteration — this is a remodel of an existing tom thumb which includes fixture and equipment updates. no change to existing store square footage, exiting & occupancy type · 278 m away
- 5809 East Lovers Lane · Tom Thumb #2642Jun 4, 2025Tom thumb site accessibility - dallas — renovation/alteration — barrier removal in the tom thumb parking lot to bring existing non-compliant conditions into conformance with adas 2010 and 2012 tas. affects approx. 2,575 sq ft · 278 m away
- 5809 E Lovers LnOct 16, 2026This is a remodel of an existing tom thumb which includes floral, employee breakroom, and fixture &equipment updates. no change to existing store square footage & exiting · 278 m away
- 7909 Stanford AveMay 15, 2025In ground pool and spa · 280 m away
- 5521 Greenville AveJul 6, 2026Floor drain in restroom · 281 m away
- 5750 E Lovers LnJan 30, 2026Replace rpz hose under meat prep area · 286 m away
- 5800 Lovers Lane · Lovers Corner Investors, LPAug 13, 2026Htpn - lovers lane fmc — renovation/alteration — tenant improvement · 296 m away
More gyms & fitness in 75206.