Roof replacement permitted at 5519 Richmond Ave
A composition shingle roof replacement at 5519 Richmond Ave was permitted by the City of Dallas on May 4, 2026. The permit describes installation of an IKO Cambridge Class 3 roof system in weathered wood color.
Summarized from City of Dallas records · updated May 4, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 4, 2026
- since May 4, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 project-remove/replace composition shingle roofinstallation:-install new synthetic felt underlayment -install ice & water shield in the valleys-install universal starter strip on eaves and rakes-install drip edge flashing -install 37 sq's iko cambridge class 3 composition roof system in a weathered wood color -install iko ridge cap shingles -install new pipe boot flashings
-remove/replace composition shingle roofinstallation:-install new synthetic felt underlayment -install ice & water shield in the valleys-install universal starter strip on eaves and rakes-install drip edge flashing -install 37 sq's iko cambridge class 3 composition roof system in a weathered wood color -install iko ridge cap shingles -install new pipe boot flashings
City of Dallas permitResidential Roofing Permit
Sources: City of Dallas
Questions about 5519 Richmond Ave
What is being built at 5519 Richmond Ave?
The City of Dallas issued a residential roofing permit for removal and replacement of the composition shingle roof on May 4, 2026.
When was the roof replacement at 5519 Richmond Ave permitted?
The permit was filed on May 4, 2026. Its permit number is RES-ROOF-26-000659.
What kind of shingles are being installed at 5519 Richmond Ave?
The permit describes 37 squares of IKO Cambridge Class 3 composition roofing in weathered wood color, with IKO ridge cap shingles.
Does the 5519 Richmond Ave permit include underlayment?
Yes. The permit describes new synthetic felt underlayment, ice and water shield in the valleys, and drip edge flashing.
Is the permit for a new home at 5519 Richmond Ave?
No new home is described in this record. The City of Dallas permit is for removing and replacing the existing composition shingle roof.
Also being built nearby
All of 75206- 5522 Richmond AveJul 23, 202650 gal gas water heater · 17 m away
- 5538 Richmond AveMay 19, 2025All work subject to field inspector approval. foundation repair only, no layout changes allowed.5538 richmond reset reshim 1640sqft to stabilize foundation · 37 m away
- 5541 Richmond AveNov 12, 20265541 richmond - demolish and haul away entire house and haul away. safely transport al of the debris tothe land?ll. shutoff and cap all utilities prior to demolition · 47 m away
- 5510 Belmont AveSep 30, 2026Remodel with new detached garage · 108 m away
- 5539 Belmont AveSep 30, 2020Demolition sfd · 111 m away
- 5506 Belmont AveMar 19, 2026Foundation repair. per the engineer's report, we will add 4, deep drilled, concrete piers. we will add continuous girder beams where there is insufficient floor support. we will raise and/or lower the floor system to bring the floor system to a more near level elevation and secure in place on new and existing supports · 115 m away
- 2112 Mcmillan AveAug 5, 2025Duplex, side b (2112b) onlygas test · 131 m away
- 2110 Mcmillan AveJul 25, 2025It is recommended at the home to install new pad and block supports (approx. 27), install 35 lf of joist, 14 lf of beam, and excavate approx. 650sf at the back of the home · 132 m away
- 5552 Belmont AveMay 11, 2026Full reroof we will be removing existing shingles and underlayment. then installing all new shingles and underlayment · 133 m away
- 2104 Mcmillan AveOct 30, 2020Install fence · 137 m away
- 2026 Euclid StSep 4, 2025Standalone gas test · 168 m away
- 2022 Euclid StJan 15, 2026Ug pool heater gas line on existing pool (adding heater to existing swimming pool) · 171 m away