2022 Euclid St
Dallas, TX 75206
New in-ground pool permitted at 2022 Euclid St
City of Dallas permits indicate a new in-ground gunite pool with paver decking was permitted at 2022 Euclid St on October 20, 2025. Additional permits cover pool lighting and equipment, plus gas lines for a pool heater, filed from October 2025 through January 2026.
Summarized from City of Dallas records · updated Jan 15, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jan 15, 2026
- since Oct 20, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 2022 Euclid St
What is being built at 2022 Euclid St?
A City of Dallas permit filed October 20, 2025, describes installation of a new in-ground gunite pool and paver decking.
When was the pool at 2022 Euclid St permitted?
The residential pool permit, RES-POOL-25-000294, was filed October 20, 2025.
Will the pool at 2022 Euclid St have lights?
A residential electrical permit filed October 21, 2025, covers wiring lights and equipment on the swimming pool.
Is a pool heater planned for 2022 Euclid St?
Gas-line permits filed January 14 and 15, 2026, describe gas lines for an existing pool and a pool heater.
What permits were filed for 2022 Euclid St?
The City of Dallas records show a pool permit filed October 20, 2025, an electrical permit filed October 21, 2025, and two plumbing permits filed January 14 and 15, 2026.
Is this a new pool or work on an existing pool at 2022 Euclid St?
The October 20, 2025, pool permit describes a new in-ground gunite pool. Later plumbing permits describe gas-line work on an existing pool.
Also being built nearby
All of 75206- 2026 Euclid StSep 4, 2025Standalone gas test · 4 m away
- 2010 Euclid StJul 17, 2025Installed hvac 3.5 ton gas system 95% and 5 ton gas system · 11 m away
- 2015 Euclid StSep 4, 2025Standalone gas test · 15 m away
- 2002 Euclid StDec 1, 2025Waterproofing balconythe balcony was constructed without any waterproofing or flashing. tiles were installed directly onto the siding, causing water penetration and damage to the plywood sub-flooror. the interior drywall was also affected due to poor installation.demolitiona section of siding must be removed and properly flashed. all tiles are to be removed along with the hand railing. an assessment of deterioration must be completed to determine and replace any damaged portions of pressure-treated decking.waterproofing and decorative installationall areas must be properly flashed and sealed with zip tape. a waterproofing base sheeting is installed along with a drip edge. a flashing lath is then secured to allow application of the first coat of waterproofing cement. at this stage, slopes are tested, and appropriate cement is applied. a second coat of waterproofing cement is then installed, followed by a rolled-on membrane. finally, a decorative textured coat with paint and sealer is applied, and the rails are reinstalled · 18 m away
- 2015 Summit AveNov 20, 2025New split system hvac in conversion area · 106 m away
- 2018 Mcmillan AveOct 21, 2026Gas test · 113 m away
- 5601 Sears StNov 12, 2025Permit to create a raised wall around drain and installing a lid on said drain in order to bring location up to city code.“ · 115 m away
- 1930 Euclid StJul 17, 2026Install/replace 3 ton airhandler - this is for unit #3 the address would not find it with the unit number · 121 m away
- 2007 Mcmillan AveJan 20, 2021Build swimming pool and spa · 130 m away
- 2104 Mcmillan AveOct 30, 2020Install fence · 131 m away
- 1922 Euclid StMay 6, 2026Work being performed on unit c · 131 m away
- 2110 Mcmillan AveJul 25, 2025It is recommended at the home to install new pad and block supports (approx. 27), install 35 lf of joist, 14 lf of beam, and excavate approx. 650sf at the back of the home · 134 m away
More pools in 75206.