groundranger
Recent · latest filing Jul 2025Residential

2010 Euclid St

Dallas, TX 75206

2010 Euclid St: 1 project on record

City of Dallas lists 1 filing across 1 project at 2010 Euclid St, Dallas, TX 75206. The most recent, filed July 17, 2025, covers: “Installed hvac 3.5 ton gas system 95% and 5 ton gas system”.

Compiled from City of Dallas records · updated Jul 17, 2025

Projects
1
1 filings
Latest filing
Jul 17, 2025
since Jul 17, 2025
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. Installed hvac 3.5 ton gas system 95% and 5 ton gas system

    Installed hvac 3.5 ton gas system 95% and 5 ton gas system

    City of Dallas permitResidential Mechanical Permit
    Record
    RES-MEC-25-001356
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 2010 Euclid St

What is being built at 2010 Euclid St?

The latest filing (City of Dallas permit RES-MEC-25-001356, July 17, 2025) covers installed hvac 3.5 ton gas system 95% and 5 ton gas system.

How many permits and filings does 2010 Euclid St have?

1 filing across 1 project, from July 17, 2025 to July 17, 2025.

Is there other construction near 2010 Euclid St?

Yes. Nearby filings include 2002 Euclid St (waterproofing balconythe balcony was constructed without any waterproofing or flashing. tiles were installed directly onto the siding, causing water penetration and damage to the plywood sub-flooror. the interior drywall was also affected due to poor installation.demolitiona section of siding must be removed and properly flashed. all tiles are to be removed along with the hand railing. an assessment of deterioration must be completed to determine and replace any damaged portions of pressure-treated decking.waterproofing and decorative installationall areas must be properly flashed and sealed with zip tape. a waterproofing base sheeting is installed along with a drip edge. a flashing lath is then secured to allow application of the first coat of waterproofing cement. at this stage, slopes are tested, and appropriate cement is applied. a second coat of waterproofing cement is then installed, followed by a rolled-on membrane. finally, a decorative textured coat with paint and sealer is applied, and the rails are reinstalled, Dec 1, 2025); 2022 Euclid St (ug pool heater gas line on existing pool (adding heater to existing swimming pool), Jan 15, 2026); 2015 Euclid St (standalone gas test, Sep 4, 2025).

How do I get alerts for new permits at 2010 Euclid St?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 75206
Get alerts for 2010 Euclid St