2015 Summit Ave
Dallas, TX 75206
Home alterations and bathroom work at 2015 Summit Ave
Residential permits filed from September through November 2025 indicate alterations to the home at 2015 Summit Ave, including enclosing an existing second-floor covered porch to create interior space. Later permits cover bathroom fixtures, electrical work and a new split-system HVAC unit in the conversion area.
Summarized from City of Dallas records · updated Nov 20, 2025
- Projects
- 7
- 7 filings
- Latest filing
- Nov 20, 2025
- since Sep 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projectsSources: City of Dallas
Questions about 2015 Summit Ave
What is being built at 2015 Summit Ave in Dallas?
Permits indicate alterations to an existing home, including enclosing a covered second-floor porch to make interior space. Other permits cover bathroom fixtures, electrical work and HVAC.
When were the permits filed for 2015 Summit Ave?
The listed 2025 permits were filed from September 15 through November 20. The latest listed filings, for electrical and mechanical work, are dated November 20, 2025.
Is a new house being built at 2015 Summit Ave?
The recent permits describe alterations to an existing residence, not new house construction. A separate City of Dallas permit from September 16, 2019, records construction of a new single-family dwelling.
What bathroom work is planned at 2015 Summit Ave?
A plumbing permit dated November 3, 2025, describes adding a toilet, sink and tub. Electrical work filed November 20 also includes wiring for a powder bath and bedroom bath.
What does permit RES-ALT-ADD-25-000806 cover?
The City of Dallas alteration permit, filed September 15, 2025, describes enclosing an existing covered second-floor porch to make an interior space.
What HVAC work is listed for 2015 Summit Ave?
Mechanical permit RES-MEC-25-003706, dated November 20, 2025, describes a new split-system HVAC unit in the conversion area.
Also being built nearby
All of 75206- 5601 Sears StNov 12, 2025Permit to create a raised wall around drain and installing a lid on said drain in order to bring location up to city code.“ · 54 m away
- 5618 Bell AveOct 5, 2026Qteam inhouse fire restoration and remodel for shell building · 56 m away
- 5622 Bell AveDec 11, 2025Gas test · 62 m away
- 5627 Bell AveMay 11, 2026Fence around vacant lot businesses in area are parking on the lot. have tried placing a chain across lot but they tear the chain down · 76 m away
- 5639 Bell AveSep 16, 2026Q-team meeting 6.2.26 (1:30 pm) construction of retail building · 95 m away
- 5643 Bell AveOct 5, 2026Qteam inhouse interior and exterior remodel for shell building · 102 m away
- 2026 Euclid StSep 4, 2025Standalone gas test · 105 m away
- 2022 Euclid StJan 15, 2026Ug pool heater gas line on existing pool (adding heater to existing swimming pool) · 106 m away
- 2010 Euclid StJul 17, 2025Installed hvac 3.5 ton gas system 95% and 5 ton gas system · 110 m away
- 2002 Euclid StDec 1, 2025Waterproofing balconythe balcony was constructed without any waterproofing or flashing. tiles were installed directly onto the siding, causing water penetration and damage to the plywood sub-flooror. the interior drywall was also affected due to poor installation.demolitiona section of siding must be removed and properly flashed. all tiles are to be removed along with the hand railing. an assessment of deterioration must be completed to determine and replace any damaged portions of pressure-treated decking.waterproofing and decorative installationall areas must be properly flashed and sealed with zip tape. a waterproofing base sheeting is installed along with a drip edge. a flashing lath is then secured to allow application of the first coat of waterproofing cement. at this stage, slopes are tested, and appropriate cement is applied. a second coat of waterproofing cement is then installed, followed by a rolled-on membrane. finally, a decorative textured coat with paint and sealer is applied, and the rails are reinstalled · 113 m away
- 2015 Euclid StSep 4, 2025Standalone gas test · 121 m away
- 5620 Richmond AveJan 27, 2026Installing 18 sq ft of subfloor.• reset/re-shim 1,618 sq ft of the structure with steel to improve leveling · 135 m away