2015 Euclid St
Dallas, TX 75206
2015 Euclid St: 1 project on record
City of Dallas lists 1 filing across 1 project at 2015 Euclid St, Dallas, TX 75206. The most recent, filed September 4, 2025, covers: “Standalone gas test”.
Compiled from City of Dallas records · updated Sep 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 4, 2025
- since Sep 4, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2015 Euclid St
What is being built at 2015 Euclid St?
The latest filing (City of Dallas permit RES-PLM-25-004440, September 4, 2025) covers standalone gas test.
How many permits and filings does 2015 Euclid St have?
1 filing across 1 project, from September 4, 2025 to September 4, 2025.
Is there other construction near 2015 Euclid St?
Yes. Nearby filings include 2010 Euclid St (installed hvac 3.5 ton gas system 95% and 5 ton gas system, Jul 17, 2025); 2022 Euclid St (ug pool heater gas line on existing pool (adding heater to existing swimming pool), Jan 15, 2026); 2026 Euclid St (standalone gas test, Sep 4, 2025).
How do I get alerts for new permits at 2015 Euclid St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75206- 2010 Euclid StJul 17, 2025Installed hvac 3.5 ton gas system 95% and 5 ton gas system · 13 m away
- 2022 Euclid StJan 15, 2026Ug pool heater gas line on existing pool (adding heater to existing swimming pool) · 15 m away
- 2026 Euclid StSep 4, 2025Standalone gas test · 17 m away
- 2002 Euclid StDec 1, 2025Waterproofing balconythe balcony was constructed without any waterproofing or flashing. tiles were installed directly onto the siding, causing water penetration and damage to the plywood sub-flooror. the interior drywall was also affected due to poor installation.demolitiona section of siding must be removed and properly flashed. all tiles are to be removed along with the hand railing. an assessment of deterioration must be completed to determine and replace any damaged portions of pressure-treated decking.waterproofing and decorative installationall areas must be properly flashed and sealed with zip tape. a waterproofing base sheeting is installed along with a drip edge. a flashing lath is then secured to allow application of the first coat of waterproofing cement. at this stage, slopes are tested, and appropriate cement is applied. a second coat of waterproofing cement is then installed, followed by a rolled-on membrane. finally, a decorative textured coat with paint and sealer is applied, and the rails are reinstalled · 17 m away
- 2018 Mcmillan AveOct 21, 2026Gas test · 100 m away
- 1930 Euclid StJul 17, 2026Install/replace 3 ton airhandler - this is for unit #3 the address would not find it with the unit number · 114 m away
- 2007 Mcmillan AveJan 20, 2021Build swimming pool and spa · 116 m away
- 2015 Summit AveNov 20, 2025New split system hvac in conversion area · 121 m away
- 2104 Mcmillan AveOct 30, 2020Install fence · 125 m away
- 1922 Euclid StMay 6, 2026Work being performed on unit c · 125 m away
- 5601 Sears StNov 12, 2025Permit to create a raised wall around drain and installing a lid on said drain in order to bring location up to city code.“ · 127 m away
- 2110 Mcmillan AveJul 25, 2025It is recommended at the home to install new pad and block supports (approx. 27), install 35 lf of joist, 14 lf of beam, and excavate approx. 650sf at the back of the home · 128 m away