5708 Goliad Ave
Dallas, TX 75206
5708 Goliad Ave: 4 projects on record
City of Dallas lists 4 filings across 4 projects at 5708 Goliad Ave, Dallas, TX 75206. The most recent, filed December 7, 2020, covers: “Remodel”.
Compiled from City of Dallas records · updated Dec 7, 2020
- Projects
- 4
- 4 filings
- Latest filing
- Dec 7, 2020
- since Dec 7, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 5708 Goliad Ave
What is being built at 5708 Goliad Ave?
The latest filing (City of Dallas permit 2010061057, December 7, 2020) covers remodel.
How many permits and filings does 5708 Goliad Ave have?
4 filings across 4 projects, from December 7, 2020 to December 7, 2020.
Is there other construction near 5708 Goliad Ave?
Yes. Nearby filings include 5702 Goliad Ave (replace or modify existing hvac, Oct 12, 2020); 5716 Goliad Ave (remove old comp shingles. furnish and install new roof using owens corning tru def duration comp shingles on both house and garage, Nov 4, 2026); 5741 Goliad Ave (water line replacement in yard, Oct 24, 2025).
How do I get alerts for new permits at 5708 Goliad Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75206- 5702 Goliad AveOct 12, 2020Replace or modify existing hvac · 12 m away
- 5716 Goliad AveNov 4, 2026Remove old comp shingles. furnish and install new roof using owens corning tru def duration comp shingles on both house and garage · 16 m away
- 5741 Goliad AveOct 24, 2025Water line replacement in yard · 64 m away
- 5715 Belmont AveAug 4, 2025Replace all wood on existing fence use the existing metal post 6’ ft & 8’ ft tall · 129 m away
- 5735 Belmont AveOct 21, 2026Repair 5 foot section of piping and install new pvc drain line · 138 m away
- 5644 Richard AveDec 3, 2025We will be building a temporary steel truss structure for the dallas marathon with coroplast signage attached to the truss. the truss will be in the roadway near the intersection of greenville ave and richard ave. the truss will have a clearance from the road to bottom of structure of 14' and an inside clearance of 26'. the very top of the truss will be 16 · 144 m away
- 5647 Richard AveJul 11, 2025Gas line to pool heater and water reroute · 147 m away
- 5715 Palo Pinto AveJun 23, 2026Will remove all existing old wiring and run new romex throughout remove federal pacific panel circuits will be ran to outdoor panel will ensure entire home is brought up to code per outlet locations and proximity will replace outdoor eaton 200a panel with new eaton 200 amp panel ( 20 year parts and labor warranty ) new overhead service and meter base will be installed as well all outlets and switches throughout home will be removed and new devices installed will add if needed per code ( color and style of choice ) will trench and pipe in overhead circuit ran for garage power all work will be permitted and inspected will run hardwired smoke and co2 detectors · 147 m away
- 5740 Palo Pinto AveMay 27, 202550 gallon gas water heater in attic · 148 m away
- 5723 Palo Pinto AveOct 1, 2026Nsfaa-two detached additions; two story with garage and studio above and single story cabana · 149 m away
- 5638 Richard AveOct 15, 2026Two tankless conversion · 154 m away
- 5737 Palo Pinto AveSep 15, 2026Replace existing rear d/s full system · 157 m away