Temporary Dallas Marathon truss permitted near Greenville and Richard
A temporary steel truss structure with coroplast signage is planned in the roadway near the intersection of Greenville Avenue and Richard Avenue for the Dallas Marathon. The City of Dallas permit was filed on December 3, 2025, under permit COM-ALT-ADD-25-001834.
Summarized from City of Dallas records · updated Dec 3, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Dec 3, 2025
- since Dec 3, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsWe will be building a temporary steel truss structure for the dallas marathon with coroplast signage attached to the truss. the truss will be in the roadway near the intersection of greenville ave and richard ave. the truss will have a clearance from the road to bottom of structure of 14' and an inside clearance of 26'. the very top of the truss will be 16
We will be building a temporary steel truss structure for the dallas marathon with coroplast signage attached to the truss. the truss will be in the roadway near the intersection of greenville ave and richard ave. the truss will have a clearance from the road to bottom of structure of 14' and an inside clearance of 26'. the very top of the truss will be 16
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 5644 Richard Ave
What is being built at 5644 Richard Ave?
A City of Dallas permit describes a temporary steel truss structure with coroplast signage for the Dallas Marathon. It was filed December 3, 2025, as permit COM-ALT-ADD-25-001834.
Where will the Dallas Marathon truss be located?
The permit says the truss will be in the roadway near the intersection of Greenville Avenue and Richard Avenue.
When was the permit for the temporary truss filed?
The City of Dallas filed permit COM-ALT-ADD-25-001834 on December 3, 2025.
What is the temporary structure made of?
The permit describes a steel truss with coroplast signage attached.
How much clearance will the truss have over the road?
The permit description specifies 14 feet of clearance from the road to the bottom of the structure and 26 feet of inside clearance.
Also being built nearby
All of 75206- 5638 Richard AveOct 15, 2026Two tankless conversion · 11 m away
- 5647 Richard AveJul 11, 2025Gas line to pool heater and water reroute · 13 m away
- 5629 Richard AveFeb 24, 2026Replace existing fence with new cedar and metal posts 6' and 8' tall · 33 m away
- 5619 Richard AveAug 3, 2026Reroof · 51 m away
- 5615 Richard AveApr 14, 2026Wire swimming pool · 58 m away
- 5610 Richard AveOct 2, 2025Replace city sidewalk and drive approach · 64 m away
- 5600 Richard AveDec 30, 20255600 richard reset reshim 1799sqft to stabilize foundation · 83 m away
- 5636 Willis AveSep 2, 2025Replace 4 ton furnace only · 116 m away
- 5702 Goliad AveOct 12, 2020Replace or modify existing hvac · 133 m away
- 5708 Goliad AveDec 7, 2020Addition to sfd · 144 m away
- 5716 Goliad AveNov 4, 2026Remove old comp shingles. furnish and install new roof using owens corning tru def duration comp shingles on both house and garage · 158 m away
- 5715 Palo Pinto AveJun 23, 2026Will remove all existing old wiring and run new romex throughout remove federal pacific panel circuits will be ran to outdoor panel will ensure entire home is brought up to code per outlet locations and proximity will replace outdoor eaton 200a panel with new eaton 200 amp panel ( 20 year parts and labor warranty ) new overhead service and meter base will be installed as well all outlets and switches throughout home will be removed and new devices installed will add if needed per code ( color and style of choice ) will trench and pipe in overhead circuit ran for garage power all work will be permitted and inspected will run hardwired smoke and co2 detectors · 165 m away