Recent · latest filing Dec 2025Residential
5600 Richard Ave
Dallas, TX 75206
Foundation repair permitted at 5600 Richard Ave
A City of Dallas permit filed December 30, 2025, covers residential foundation repair at 5600 Richard Ave. The permit description says the work is to stabilize the foundation by resetting and reshimming 1,799 square feet.
Summarized from City of Dallas records · updated Dec 30, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 30, 2025
- since Dec 30, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5600 Richard Ave
What work is planned at 5600 Richard Ave?
A City of Dallas permit describes residential foundation work to stabilize the foundation by resetting and reshimming 1,799 square feet.
When was the foundation repair permit filed?
The permit was filed December 30, 2025.
What is the permit number for 5600 Richard Ave?
The permit number is RES-FDN-25-000821.
Is a new home being built at 5600 Richard Ave?
The available record describes residential foundation repair, not new home construction.
How much will the foundation work cost?
The permit record does not list a project cost.
Also being built nearby
All of 75206- 5610 Richard AveOct 2, 2025Replace city sidewalk and drive approach · 19 m away
- 5615 Richard AveApr 14, 2026Wire swimming pool · 29 m away
- 5619 Richard AveAug 3, 2026Reroof · 36 m away
- 5629 Richard AveFeb 24, 2026Replace existing fence with new cedar and metal posts 6' and 8' tall · 54 m away
- 5638 Richard AveOct 15, 2026Two tankless conversion · 72 m away
- 5644 Richard AveDec 3, 2025We will be building a temporary steel truss structure for the dallas marathon with coroplast signage attached to the truss. the truss will be in the roadway near the intersection of greenville ave and richard ave. the truss will have a clearance from the road to bottom of structure of 14' and an inside clearance of 26'. the very top of the truss will be 16 · 83 m away
- 5647 Richard AveJul 11, 2025Gas line to pool heater and water reroute · 88 m away
- 5551 Richard AveOct 24, 2025Take overhead to underground · 119 m away
- 5548 Richard AveDec 1, 2020Demolition sfd · 123 m away
- 5544 Richard AveAug 11, 2026908.2ft lineal feet of floor joist187ft lineal feet of girder beam64 sq ft subfloor replacement/reinforce · 132 m away
- 5545 Richard AveNov 5, 2025The city sidewalk in front of mrs. oxners piece of land is all broken up and in bad shape. good deal builder plans to remove the old concrete and pour a new sidewalk with 3/8ths rebar through out. it is approx. 37' long by 4' wide · 132 m away
- 5636 Willis AveSep 2, 2025Replace 4 ton furnace only · 134 m away