5544 Richard Ave
Dallas, TX 75206
Foundation permit lists floor joist and subfloor repairs
A residential foundation repair permit for 5544 Richard Ave lists work on floor joists, a girder beam and 64 square feet of subfloor. The City of Dallas permit was filed August 11, 2026, under permit RES-FDN-26-000620.
Summarized from City of Dallas records · updated Aug 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 11, 2026
- since Aug 11, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 project908.2ft lineal feet of floor joist187ft lineal feet of girder beam64 sq ft subfloor replacement/reinforce
908.2ft lineal feet of floor joist187ft lineal feet of girder beam64 sq ft subfloor replacement/reinforce
City of Dallas permitResidential Foundation Repair
Sources: City of Dallas
Questions about 5544 Richard Ave
What is being repaired at 5544 Richard Ave?
A City of Dallas permit lists 908.2 linear feet of floor joists, 187 linear feet of girder beam and 64 square feet of subfloor for replacement or reinforcement.
When was the repair permit filed for 5544 Richard Ave?
The permit was filed August 11, 2026. Its number is RES-FDN-26-000620.
Is a new home being built at 5544 Richard Ave?
The available City of Dallas record describes residential foundation repair, including work on floor joists, a girder beam and subfloor. It does not describe new home construction.
What does permit RES-FDN-26-000620 cover?
The permit record lists floor joist and girder beam work, along with replacement or reinforcement of 64 square feet of subfloor. It was filed August 11, 2026.
How much floor joist work is listed at 5544 Richard Ave?
The permit description lists 908.2 linear feet of floor joists. It also lists 187 linear feet of girder beam and 64 square feet of subfloor replacement or reinforcement.
Also being built nearby
All of 75206- 5548 Richard AveDec 1, 2020Demolition sfd · 9 m away
- 5545 Richard AveNov 5, 2025The city sidewalk in front of mrs. oxners piece of land is all broken up and in bad shape. good deal builder plans to remove the old concrete and pour a new sidewalk with 3/8ths rebar through out. it is approx. 37' long by 4' wide · 13 m away
- 5541 Richard AveAug 26, 2026Installation of whole-house automatic water shut off valve · 15 m away
- 5551 Richard AveOct 24, 2025Take overhead to underground · 18 m away
- 5516 Richard AveNov 18, 2026Remove and haul off existing roofing materials. install a new architectural roofing system · 33 m away
- 5527 Richard AveAug 11, 2026Install 174lf 8' side by side horizontal wooden fencing · 42 m away
- 5523 Richard AveSep 9, 2026Install 259lf 8' board on board horizontal wooden fencing · 50 m away
- 5519 Richard AveSep 9, 2025Panel replacement · 59 m away
- 5512 Richard AveFeb 19, 2026Mcr new residential swimming pool & spa · 70 m away
- 5513 Richard AveOct 13, 2026Building 164' of new fence, board on board with cap. the fence will be 6' for the first 40' and then step up to 8' along the west side of the house and the back of the house. this will also include a 20' electric sliding gate on the back at 8' tall. installing 2 new gates on both sides of the house. east side gate section is 10' wide with a standard 4' walk gate, west side is a 6' wide section with astandard 4' walk gate. includes demolition of existing fence on west side and moving the whole fence 18" further west to follow property line. fence is already erected. needing final inspection · 72 m away
- 5509 Richard AveDec 24, 2020Install lawn sprinkler · 80 m away
- 5506 Richard AveJun 9, 2026Replacing 2 ton electric complete system · 84 m away