Residential pool and spa permitted at 5512 Richard Ave
A new residential swimming pool and spa are covered by a City of Dallas permit at 5512 Richard Ave. The permit, RES-POOL-25-000360, was filed on February 19, 2026; the record does not list a project cost or construction timeline.
Summarized from City of Dallas records · updated Feb 19, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 19, 2026
- since Feb 19, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5512 Richard Ave
What is being built at 5512 Richard Ave?
A City of Dallas permit describes a new residential swimming pool and spa. The record does not provide further project details.
When was the pool permit filed?
The City of Dallas permit was filed on February 19, 2026. Its permit number is RES-POOL-25-000360.
Is the project a residential pool or a commercial pool?
The permit describes a new residential swimming pool and spa.
How much will the pool project cost?
The available permit record does not list a project cost.
When will the pool and spa be completed?
The permit record does not provide a construction schedule or completion date.
Also being built nearby
All of 75206- 5513 Richard AveOct 13, 2026Building 164' of new fence, board on board with cap. the fence will be 6' for the first 40' and then step up to 8' along the west side of the house and the back of the house. this will also include a 20' electric sliding gate on the back at 8' tall. installing 2 new gates on both sides of the house. east side gate section is 10' wide with a standard 4' walk gate, west side is a 6' wide section with astandard 4' walk gate. includes demolition of existing fence on west side and moving the whole fence 18" further west to follow property line. fence is already erected. needing final inspection · 13 m away
- 5506 Richard AveJun 9, 2026Replacing 2 ton electric complete system · 13 m away
- 5509 Richard AveDec 24, 2020Install lawn sprinkler · 15 m away
- 5519 Richard AveSep 9, 2025Panel replacement · 18 m away
- 5523 Richard AveSep 9, 2026Install 259lf 8' board on board horizontal wooden fencing · 25 m away
- 5527 Richard AveAug 11, 2026Install 174lf 8' side by side horizontal wooden fencing · 33 m away
- 5516 Richard AveNov 18, 2026Remove and haul off existing roofing materials. install a new architectural roofing system · 55 m away
- 5541 Richard AveAug 26, 2026Installation of whole-house automatic water shut off valve · 63 m away
- 5544 Richard AveAug 11, 2026908.2ft lineal feet of floor joist187ft lineal feet of girder beam64 sq ft subfloor replacement/reinforce · 70 m away
- 5545 Richard AveNov 5, 2025The city sidewalk in front of mrs. oxners piece of land is all broken up and in bad shape. good deal builder plans to remove the old concrete and pour a new sidewalk with 3/8ths rebar through out. it is approx. 37' long by 4' wide · 72 m away
- 5548 Richard AveDec 1, 2020Demolition sfd · 79 m away
- 5551 Richard AveOct 24, 2025Take overhead to underground · 85 m away