5545 Richard Ave
Dallas, TX 75206
Sidewalk replacement permitted at 5545 Richard Ave
A permit indicates that the damaged sidewalk in front of 5545 Richard Ave will be replaced with new concrete reinforced with rebar. The City of Dallas permit was filed on November 5, 2025, and describes an approximately 37-foot-long, 4-foot-wide sidewalk.
Summarized from City of Dallas records · updated Nov 5, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 5, 2025
- since Nov 5, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectThe city sidewalk in front of mrs. oxners piece of land is all broken up and in bad shape. good deal builder plans to remove the old concrete and pour a new sidewalk with 3/8ths rebar through out. it is approx. 37' long by 4' wide
The city sidewalk in front of mrs. oxners piece of land is all broken up and in bad shape. good deal builder plans to remove the old concrete and pour a new sidewalk with 3/8ths rebar through out. it is approx. 37' long by 4' wide
City of Dallas permitResidential Drive Approach and Sidewalk Permit
Sources: City of Dallas
Questions about 5545 Richard Ave
What is being built at 5545 Richard Ave in Dallas?
A City of Dallas permit describes replacing the sidewalk in front of the property with new concrete and rebar. It does not describe a new building.
When was the sidewalk permit filed for 5545 Richard Ave?
The permit was filed on November 5, 2025. Its permit number is RES-DSW-25-000450.
How long is the sidewalk being replaced at 5545 Richard Ave?
The permit describes an approximately 37-foot-long section of sidewalk, about 4 feet wide.
Is a new home being built at 5545 Richard Ave?
The record provided is for a residential drive approach and sidewalk permit, not a new-home construction permit.
What materials will be used for the sidewalk at 5545 Richard Ave?
The permit description says the old concrete will be removed and replaced with new concrete reinforced with 3/8-inch rebar.
Also being built nearby
All of 75206- 5541 Richard AveAug 26, 2026Installation of whole-house automatic water shut off valve · 9 m away
- 5544 Richard AveAug 11, 2026908.2ft lineal feet of floor joist187ft lineal feet of girder beam64 sq ft subfloor replacement/reinforce · 13 m away
- 5551 Richard AveOct 24, 2025Take overhead to underground · 13 m away
- 5548 Richard AveDec 1, 2020Demolition sfd · 15 m away
- 5527 Richard AveAug 11, 2026Install 174lf 8' side by side horizontal wooden fencing · 40 m away
- 5516 Richard AveNov 18, 2026Remove and haul off existing roofing materials. install a new architectural roofing system · 43 m away
- 5523 Richard AveSep 9, 2026Install 259lf 8' board on board horizontal wooden fencing · 49 m away
- 5519 Richard AveSep 9, 2025Panel replacement · 57 m away
- 5513 Richard AveOct 13, 2026Building 164' of new fence, board on board with cap. the fence will be 6' for the first 40' and then step up to 8' along the west side of the house and the back of the house. this will also include a 20' electric sliding gate on the back at 8' tall. installing 2 new gates on both sides of the house. east side gate section is 10' wide with a standard 4' walk gate, west side is a 6' wide section with astandard 4' walk gate. includes demolition of existing fence on west side and moving the whole fence 18" further west to follow property line. fence is already erected. needing final inspection · 71 m away
- 5512 Richard AveFeb 19, 2026Mcr new residential swimming pool & spa · 72 m away
- 5509 Richard AveDec 24, 2020Install lawn sprinkler · 79 m away
- 5506 Richard AveJun 9, 2026Replacing 2 ton electric complete system · 85 m away