5548 Richard Ave
Dallas, TX 75206
5548 Richard Ave: 3 projects on record
City of Dallas lists 3 filings across 3 projects at 5548 Richard Ave, Dallas, TX 75206. The most recent, filed December 1, 2020, covers: “Demolition sfd”.
Compiled from City of Dallas records · updated Dec 1, 2020
- Projects
- 3
- 3 filings
- Latest filing
- Dec 1, 2020
- since Dec 1, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 5548 Richard Ave
What is being built at 5548 Richard Ave?
The latest filing (City of Dallas permit 2011231035, December 1, 2020) covers demolition sfd.
How many permits and filings does 5548 Richard Ave have?
3 filings across 3 projects, from December 1, 2020 to December 1, 2020.
Is there other construction near 5548 Richard Ave?
Yes. Nearby filings include 5544 Richard Ave (908.2ft lineal feet of floor joist187ft lineal feet of girder beam64 sq ft subfloor replacement/reinforce, Aug 11, 2026); 5551 Richard Ave (take overhead to underground, Oct 24, 2025); 5545 Richard Ave (the city sidewalk in front of mrs. oxners piece of land is all broken up and in bad shape. good deal builder plans to remove the old concrete and pour a new sidewalk with 3/8ths rebar through out. it is approx. 37' long by 4' wide, Nov 5, 2025).
How do I get alerts for new permits at 5548 Richard Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75206- 5544 Richard AveAug 11, 2026908.2ft lineal feet of floor joist187ft lineal feet of girder beam64 sq ft subfloor replacement/reinforce · 9 m away
- 5551 Richard AveOct 24, 2025Take overhead to underground · 13 m away
- 5545 Richard AveNov 5, 2025The city sidewalk in front of mrs. oxners piece of land is all broken up and in bad shape. good deal builder plans to remove the old concrete and pour a new sidewalk with 3/8ths rebar through out. it is approx. 37' long by 4' wide · 15 m away
- 5541 Richard AveAug 26, 2026Installation of whole-house automatic water shut off valve · 22 m away
- 5516 Richard AveNov 18, 2026Remove and haul off existing roofing materials. install a new architectural roofing system · 39 m away
- 5527 Richard AveAug 11, 2026Install 174lf 8' side by side horizontal wooden fencing · 50 m away
- 5523 Richard AveSep 9, 2026Install 259lf 8' board on board horizontal wooden fencing · 59 m away
- 5519 Richard AveSep 9, 2025Panel replacement · 67 m away
- 5512 Richard AveFeb 19, 2026Mcr new residential swimming pool & spa · 79 m away
- 5513 Richard AveOct 13, 2026Building 164' of new fence, board on board with cap. the fence will be 6' for the first 40' and then step up to 8' along the west side of the house and the back of the house. this will also include a 20' electric sliding gate on the back at 8' tall. installing 2 new gates on both sides of the house. east side gate section is 10' wide with a standard 4' walk gate, west side is a 6' wide section with astandard 4' walk gate. includes demolition of existing fence on west side and moving the whole fence 18" further west to follow property line. fence is already erected. needing final inspection · 80 m away
- 5509 Richard AveDec 24, 2020Install lawn sprinkler · 89 m away
- 5506 Richard AveJun 9, 2026Replacing 2 ton electric complete system · 93 m away