5519 Richard Ave
Dallas, TX 75206
5519 Richard Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 5519 Richard Ave, Dallas, TX 75206. The most recent, filed September 9, 2025, covers: “Panel replacement”.
Compiled from City of Dallas records · updated Sep 9, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 9, 2025
- since Sep 9, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5519 Richard Ave
What is being built at 5519 Richard Ave?
The latest filing (City of Dallas permit RES-ELC-25-002886, September 9, 2025) covers panel replacement.
How many permits and filings does 5519 Richard Ave have?
1 filing across 1 project, from September 9, 2025 to September 9, 2025.
Is there other construction near 5519 Richard Ave?
Yes. Nearby filings include 5523 Richard Ave (install 259lf 8' board on board horizontal wooden fencing, Sep 9, 2026); 5513 Richard Ave (building 164' of new fence, board on board with cap. the fence will be 6' for the first 40' and then step up to 8' along the west side of the house and the back of the house. this will also include a 20' electric sliding gate on the back at 8' tall. installing 2 new gates on both sides of the house. east side gate section is 10' wide with a standard 4' walk gate, west side is a 6' wide section with astandard 4' walk gate. includes demolition of existing fence on west side and moving the whole fence 18" further west to follow property line. fence is already erected. needing final inspection, Oct 13, 2026); 5527 Richard Ave (install 174lf 8' side by side horizontal wooden fencing, Aug 11, 2026).
How do I get alerts for new permits at 5519 Richard Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75206- 5523 Richard AveSep 9, 2026Install 259lf 8' board on board horizontal wooden fencing · 9 m away
- 5513 Richard AveOct 13, 2026Building 164' of new fence, board on board with cap. the fence will be 6' for the first 40' and then step up to 8' along the west side of the house and the back of the house. this will also include a 20' electric sliding gate on the back at 8' tall. installing 2 new gates on both sides of the house. east side gate section is 10' wide with a standard 4' walk gate, west side is a 6' wide section with astandard 4' walk gate. includes demolition of existing fence on west side and moving the whole fence 18" further west to follow property line. fence is already erected. needing final inspection · 13 m away
- 5527 Richard AveAug 11, 2026Install 174lf 8' side by side horizontal wooden fencing · 18 m away
- 5512 Richard AveFeb 19, 2026Mcr new residential swimming pool & spa · 18 m away
- 5509 Richard AveDec 24, 2020Install lawn sprinkler · 22 m away
- 5506 Richard AveJun 9, 2026Replacing 2 ton electric complete system · 29 m away
- 5541 Richard AveAug 26, 2026Installation of whole-house automatic water shut off valve · 49 m away
- 5516 Richard AveNov 18, 2026Remove and haul off existing roofing materials. install a new architectural roofing system · 51 m away
- 5545 Richard AveNov 5, 2025The city sidewalk in front of mrs. oxners piece of land is all broken up and in bad shape. good deal builder plans to remove the old concrete and pour a new sidewalk with 3/8ths rebar through out. it is approx. 37' long by 4' wide · 57 m away
- 5544 Richard AveAug 11, 2026908.2ft lineal feet of floor joist187ft lineal feet of girder beam64 sq ft subfloor replacement/reinforce · 59 m away
- 5548 Richard AveDec 1, 2020Demolition sfd · 67 m away
- 5551 Richard AveOct 24, 2025Take overhead to underground · 71 m away