5807 E Mockingbird Ln
Dallas, TX 75206
New single-family home follows house demolition
City of Dallas permits indicate a single-family home is being built at 5807 E Mockingbird Ln after the existing house was permitted for demolition on June 25, 2025. A residential new-construction permit followed on August 15, 2025. Later permits cover plumbing, electrical work, two HVAC systems and a new fence, with the latest filing dated October 20, 2026.
Summarized from City of Dallas records · updated Oct 20, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Oct 20, 2026
- since Jun 25, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsSources: City of Dallas
Questions about 5807 E Mockingbird Ln
What is being built at 5807 E Mockingbird Ln?
City of Dallas records show a residential new-construction permit and a permit for a single-family plumbing system, indicating a new single-family home.
Was the existing house at 5807 E Mockingbird Ln demolished?
A City of Dallas permit for demolition of the existing structure or house was filed June 25, 2025. The permit number is RES-DEM-25-000145.
When was new construction permitted at 5807 E Mockingbird Ln?
The residential new-construction permit was filed August 15, 2025. Its permit number is RES-NEW-25-000339.
What other permits were filed for 5807 E Mockingbird Ln?
Records include permits for plumbing, electrical work, two central HVAC systems with gas furnaces and ducts, and a new fence. The latest listed permit, for the fence, was filed October 20, 2026.
How much will the project at 5807 E Mockingbird Ln cost?
The records provided do not include a reported valuation or a TDLR project cost estimate.
Also being built nearby
All of 75206- 5815 E Mockingbird LnDec 15, 2020Install new plumbing · 15 m away
- 5828 E Mockingbird LnOct 22, 2025Demolition old lighting and power in staff lounge. install new lighting, power, and receptacles in new staff lounge and entry · 47 m away
- 5828 Mockingbird Lane · Dallas Independant School DistrictOct 30, 2024Mockingbird elementry school — renovation/alteration — the project includes minor interior renovations to provide a new secure entry vestibule and provide a new staff lounge. the main entrance to the building will be moved to the east entrance where the existing sidewalk and ramp will be replaced. a po · 47 m away
- 5814 Palm LnDec 10, 2020Replace or modify existing hvac · 83 m away
- 5807 Palm LnNov 5, 2026Replace main sewerline in yard · 95 m away
- 5837 Palm LnSep 28, 2020Gas test · 102 m away
- 5742 E Mockingbird LnAug 13, 2025Disconnect one power drop to display and reconnect one power drop when display is reinstalled · 151 m away
- 4211 Delmar AveNov 10, 2026Dig and replace sewer lines from cleanouts to guest bathroom about 25ft · 189 m away
- 4217 Delmar AveNov 12, 2026Replacement of the house sewer relay from backyard cleanouts to city tie in · 189 m away
- 5720 E Mockingbird LnFeb 26, 2026Repair broken sewer pipe · 194 m away
- 5718 E Mockingbird LnOct 14, 2020Install electrical for new contruction or addition · 198 m away
- 5734 Winton StMar 12, 20263-ton gas full system replacement · 200 m away
More demolitions in 75206.