Mockingbird Elementary renovations add secure entry and staff lounge
Renovations at Mockingbird Elementary School include a secure entry vestibule and new staff lounge. The TDLR project registration, dated October 30, 2024, also describes moving the main entrance to the east entrance and replacing the sidewalk and ramp there. The project listing reports 76,938 square feet and an applicant-estimated cost of $2,473,340.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 30, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 30, 2024
- since Oct 30, 2024
- Largest scope
- 76,938 sf
- Estimated cost
- $2.5M
- state registration
Where this project stands
Inspected · closing outMockingbird Elementry School
76,938 sq ft · $2.5M est.
- RegisteredOct 30, 2024
- Plan review
- ConstructionJun '25 – Mar '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThe project includes minor interior renovations to provide a new secure entry vestibule and provide a new staff lounge. the main entrance to the building will be moved to the east entrance where the existing sidewalk and ramp will be replaced. a po — mockingbird elementry school
TDLR project registrationRenovation/AlterationInspection Complete76,938 sq ft$2.5M est.- Project #
- TABS2025004502
- Tenant / owner
- Mockingbird Elementry School
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5828 Mockingbird Lane
What is being built at 5828 Mockingbird Lane in Dallas?
The project is an interior renovation at Mockingbird Elementary School, including a secure entry vestibule and a new staff lounge. The main entrance is also being moved to the east entrance.
When was the Mockingbird Elementary renovation filed?
The TDLR registration for project TABS2025004502 is dated October 30, 2024.
Is Mockingbird Elementary getting a new entrance?
The project description says the main entrance will move to the east entrance. The existing sidewalk and ramp there will be replaced.
How much will the Mockingbird Elementary project cost?
The TDLR registration lists an applicant-estimated project cost of $2,473,340. This is an estimate, not a confirmed final cost.
How large is the Mockingbird Elementary renovation?
The project registration lists the project area as 76,938 square feet.
Is the Mockingbird Elementary project complete?
The TDLR listing shows the project status as “Inspection Complete.”
Also being built nearby
All of 75206- 5828 E Mockingbird LnOct 22, 2025Demolition old lighting and power in staff lounge. install new lighting, power, and receptacles in new staff lounge and entry
- 5815 E Mockingbird LnDec 15, 2020Install new plumbing · 36 m away
- 5807 E Mockingbird LnOct 20, 2026New fence · 47 m away
- 5814 Palm LnDec 10, 2020Replace or modify existing hvac · 111 m away
- 5837 Palm LnSep 28, 2020Gas test · 120 m away
- 5807 Palm LnNov 5, 2026Replace main sewerline in yard · 127 m away
- 4211 Delmar AveNov 10, 2026Dig and replace sewer lines from cleanouts to guest bathroom about 25ft · 154 m away
- 4217 Delmar AveNov 12, 2026Replacement of the house sewer relay from backyard cleanouts to city tie in · 157 m away
- 4226 Delmar AveSep 23, 2025We will be adding an approach to connect the new paver driveway to the street. the paver driveway has already been completed by another company · 175 m away
- 5915 Winton StMar 9, 2026Move meter base to garage · 184 m away
- 5742 E Mockingbird LnAug 13, 2025Disconnect one power drop to display and reconnect one power drop when display is reinstalled · 189 m away
- 5919 Winton StNov 23, 2020Interior remodel only · 189 m away