110 Express St
Dallas, TX 75207
New 300-amp electrical panel permitted at 110 Express St
A new 300-amp electrical panel is permitted to replace a burned Federal Pacific panel at 110 Express St. The City of Dallas issued the commercial electrical permit on December 4, 2025, under permit COM-ELC-25-003480.
Summarized from City of Dallas records · updated Dec 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 4, 2025
- since Dec 4, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 110 Express St
What is being built at 110 Express St in Dallas?
A new 300-amp electrical panel is permitted to replace a burned Federal Pacific panel. The City of Dallas permit is COM-ELC-25-003480, dated December 4, 2025.
Is a new building going up at 110 Express St?
The available permit is for replacing an electrical panel, not for a new building. It was issued on December 4, 2025.
What electrical work is permitted at 110 Express St?
The permit describes replacing an old burned Federal Pacific 300-amp panel with a new 300-amp electrical panel.
When was the electrical permit issued for 110 Express St?
The City of Dallas issued commercial electrical permit COM-ELC-25-003480 on December 4, 2025.
What is being permitted near Thermo 480v Power?
At 110 Express St, about 159 meters from Thermo 480v Power, a permit covers replacing a burned 300-amp electrical panel. The permit was issued December 4, 2025.
Also being built nearby
All of 75207- 120 Express StDec 8, 2020Service release no work · 32 m away
- 131 Express StDec 8, 2020Interior / exterior remodel - creating suite 110 from suite 100 · 65 m away
- 2001 Levee StSep 17, 2026Demolition of a building · 74 m away
- 106-110 Manufacturing St · The Design DistrictJul 2, 2025Pdre manufacturing, llc — renovation/alteration — tenant improvement · 143 m away
- 110 Manufacturing StSep 4, 2025Relocate and add new bathrooms · 143 m away
- 101 Manufacturing StMay 13, 2025Ew no work permit · 148 m away
- 111 Manufacturing StSep 25, 2025400 amp service with office finish out · 155 m away
- 111 Manufacturing Street · Quadrant Investment Properties LLCJul 11, 2024Qip — renovation/alteration — interior renovation · 155 m away
- 120 Turtle Creek BlvdOct 23, 2026Relocate gas main line · 156 m away
- 115 Manufacturing Street · Quadrant Investment Properies, LLCJan 23, 2024Interface — renovation/alteration — interior remodel of office / showroom. update / remodel of main entrance · 159 m away
- 1105 Levee StAug 14, 2026Primetime electrical contractors will install a new 400-amp electrical service (480volt) for the building to meet current and future power demands. scope includes: • installation of a 400-amp meter base on the exterior of the building in compliance with local utility and nec requirements. • installation of a 400-amp service disconnect adjacent to the meter base to provide a code-compliant means of disconnect. • installation of a 400-amp i-line distribution panel inside the building to serve as the main distribution point for interior loads. • installation of a step-down transformer to reduce the incoming 480v service to 240/120v for existing lighting and receptacle circuits. • wreck out existing interior meter, after the power company cut it off. • all conduit, conductors, grounding, bonding, and terminations will be completed per the code and local authority requirements. • the system will be tested, labeled, and verified for full functionality upon completion · 159 m away
- 1211 E Levee St · Giamrone Design District Projects LLCMay 20, 2024Sounders event space — renovation/alteration — tenant finish-out · 159 m away