120 Turtle Creek Blvd
Dallas, TX 75207
Gas main relocation permitted at 120 Turtle Creek Blvd
A gas main line relocation was permitted at 120 Turtle Creek Blvd in Dallas on October 23, 2026. The City of Dallas record is a commercial plumbing permit, COM-PLM-26-004092.
Summarized from City of Dallas records · updated Oct 23, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 23, 2026
- since Oct 23, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 120 Turtle Creek Blvd
What is being built at 120 Turtle Creek Blvd?
The City of Dallas issued a permit to relocate a gas main line at the address. The record does not describe a new building.
When was the gas main relocation permitted at 120 Turtle Creek Blvd?
The permit was filed on October 23, 2026. Its number is COM-PLM-26-004092.
Is a new building planned at 120 Turtle Creek Blvd?
The available City of Dallas record covers relocation of a gas main line. It does not identify a new building project.
What is happening near L'atelier Paris on Turtle Creek Blvd?
A gas main line relocation was permitted at 120 Turtle Creek Blvd, about 96 meters from L'atelier Paris at 150 Turtle Creek Blvd. The permit was filed October 23, 2026.
What work is permitted near Thermo 480v Power?
The City of Dallas permit at 120 Turtle Creek Blvd covers relocation of a gas main line. Thermo 480v Power is listed at 1105 E Levee St, about 77 meters away.
Also being built nearby
All of 75207- 139 Turtle Creek Blvd · N13group, LLCApr 22, 2026Remodel plumbing, tankless water heater. adding three bf devices · 59 m away
- 1105 E Levee St · Trips Levee Gp LLCMay 21, 2026Thermo 480v power — renovation/alteration — install 3 phase 480 electrical to building, and change rear exit to swinging door · 77 m away
- 1211 E Levee St · Giamrone Design District Projects LLCMay 20, 2024Sounders event space — renovation/alteration — tenant finish-out · 77 m away
- 1105 Levee StAug 14, 2026Primetime electrical contractors will install a new 400-amp electrical service (480volt) for the building to meet current and future power demands. scope includes: • installation of a 400-amp meter base on the exterior of the building in compliance with local utility and nec requirements. • installation of a 400-amp service disconnect adjacent to the meter base to provide a code-compliant means of disconnect. • installation of a 400-amp i-line distribution panel inside the building to serve as the main distribution point for interior loads. • installation of a step-down transformer to reduce the incoming 480v service to 240/120v for existing lighting and receptacle circuits. • wreck out existing interior meter, after the power company cut it off. • all conduit, conductors, grounding, bonding, and terminations will be completed per the code and local authority requirements. • the system will be tested, labeled, and verified for full functionality upon completion · 77 m away
- 1841 Levee StSep 10, 2026Remodel plumbing · 77 m away
- 1839 Levee StOct 29, 2020Gas test · 79 m away
- 1835 Levee StOct 29, 2020Gas test · 85 m away
- 150 Turtle Creek Blvd · C/O Asana Partners LP ColumbiaJul 16, 2025Dawson agency — renovation/alteration — cabinetry, paint, carpet, tile, dividing walls · 96 m away
- 150 Turtle Creek BlvdNov 17, 2026Electrical tenant finish-out for l'atelier paris showroom-demolishing existing lighting and devises and installing new led and emergency egress fixtures. -relocating track lighting, -adding lighting controls-new receptacles and floor feeds-connecting the restroom exhuast fan · 96 m away
- 1821 Levee StJan 12, 2021To complete work permit 1701111072 · 125 m away
- 1815 Levee StNov 4, 2025Gas test · 147 m away
- 167 Turtle Creek Blvd · City Of DallasFeb 18, 2026Traffic signal at three intersections — renovation/alteration — 3 intersection signal improvements consisting of signal replacement, ramp replacement, concrete paving and pavement markings (approx. 4,000 sq ft) · 147 m away