1105 E Levee St
Dallas, TX 75207 · Trips Levee Gp LLC
Electrical upgrades and rear exit change at 1105 E Levee St
A renovation at 1105 E Levee St calls for three-phase 480-volt electrical service and a change to the rear exit door. The project was registered with the Texas Department of Licensing and Regulation on May 21, 2026; the applicant’s estimated project cost is $69,928.
Summarized from Texas Department of Licensing and Regulation records · updated May 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 21, 2026
- since May 21, 2026
- Largest scope
- 7,640 sf
- Estimated cost
- $70K
- state registration
Where this project stands
In state plan reviewThermo 480V Power
7,640 sq ft · $70K est.
- RegisteredMay 21, 2026
- Plan reviewnow
- ConstructionJul '26 – Jun '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInstall 3 phase 480 electrical to building, and change rear exit to swinging door. — trinity industrial district
TDLR project registrationRenovation/AlterationProject Registered7,640 sq ft$70K est.- Project #
- TABS2026020988
- Tenant / owner
- Thermo 480v Power
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1105 E Levee St
What is being built at 1105 E Levee St?
A TDLR-registered renovation calls for installing three-phase 480-volt electrical service and changing the rear exit to a swinging door.
When was the 1105 E Levee St project registered?
The project was registered on May 21, 2026. Its TDLR registration number is TABS2026020988.
How much will the work at 1105 E Levee St cost?
The applicant’s estimated cost for the project is $69,928.
Is a new business opening at 1105 E Levee St?
The registration describes electrical work and a rear exit door change. It does not identify a new business opening.
What is planned near L'atelier Paris in Dallas?
At 1105 E Levee St, about 172 meters from L'atelier Paris, a registered renovation calls for three-phase 480-volt electrical service and a change to the rear exit door.
What work is planned in the Trinity Industrial District at 1105 E Levee St?
The project description identifies electrical upgrades and a rear exit door change at the building. It was registered with TDLR on May 21, 2026.
Also being built nearby
All of 75207- 1105 Levee StAug 14, 2026Primetime electrical contractors will install a new 400-amp electrical service (480volt) for the building to meet current and future power demands. scope includes: • installation of a 400-amp meter base on the exterior of the building in compliance with local utility and nec requirements. • installation of a 400-amp service disconnect adjacent to the meter base to provide a code-compliant means of disconnect. • installation of a 400-amp i-line distribution panel inside the building to serve as the main distribution point for interior loads. • installation of a step-down transformer to reduce the incoming 480v service to 240/120v for existing lighting and receptacle circuits. • wreck out existing interior meter, after the power company cut it off. • all conduit, conductors, grounding, bonding, and terminations will be completed per the code and local authority requirements. • the system will be tested, labeled, and verified for full functionality upon completion
- 1211 E Levee St · Giamrone Design District Projects LLCMay 20, 2024Sounders event space — renovation/alteration — tenant finish-out
- 1841 Levee StSep 10, 2026Remodel plumbing · 9 m away
- 1839 Levee StOct 29, 2020Gas test · 18 m away
- 1835 Levee StOct 29, 2020Gas test · 36 m away
- 120 Turtle Creek BlvdOct 23, 2026Relocate gas main line · 77 m away
- 1821 Levee StJan 12, 2021To complete work permit 1701111072 · 98 m away
- 1815 Levee StNov 4, 2025Gas test · 125 m away
- 139 Turtle Creek Blvd · N13group, LLCApr 22, 2026Remodel plumbing, tankless water heater. adding three bf devices · 135 m away
- 110 Express StDec 4, 2025Replacing old burned federal pacific 300 amp panel with a new 300 amp electrical panel · 159 m away
- 120 Express StDec 8, 2020Service release no work · 172 m away
- 150 Turtle Creek Blvd · C/O Asana Partners LP ColumbiaJul 16, 2025Dawson agency — renovation/alteration — cabinetry, paint, carpet, tile, dividing walls · 172 m away