Water heater and gas-test permits at 1402 Kings Hwy
Two residential plumbing permits at 1402 Kings Hwy cover a water heater installation and a gas test. The City of Dallas issued the water heater permit on September 24, 2025, and the gas-test permit on October 22, 2025.
Summarized from City of Dallas records · updated Oct 22, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 22, 2025
- since Sep 24, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 1402 Kings Hwy
What work is happening at 1402 Kings Hwy?
City of Dallas records show a water heater installation and a gas test under residential plumbing permits.
When was work permitted at 1402 Kings Hwy?
The water heater installation permit was filed September 24, 2025. The gas-test permit was filed October 22, 2025.
What is permit RES-PLM-25-005325 for?
The City of Dallas permit, filed September 24, 2025, is for a water heater installation at 1402 Kings Hwy.
What is permit RES-PLM-25-006367 for?
The October 22, 2025, residential plumbing permit is for a gas test. Its description says a gauge was put on the meter and gas was turned off.
Is a new building being built at 1402 Kings Hwy?
The two records provided are residential plumbing permits for a water heater installation and a gas test. They do not describe construction of a new building.
Also being built nearby
All of 75208- 1415 Kings HwyApr 30, 2026Gas test · 13 m away
- 1401 Kings HwySep 24, 2025Plumbing for kitchen and bathroom · 13 m away
- 1423 Kings HwyOct 7, 2025Hvac replacement · 16 m away
- 1331 Kings HwyJan 28, 2021Remove & replace 4x9 sidewalk and approach modify approach · 35 m away
- 1324 Kings HwyOct 9, 2025Unit #3 gas test · 47 m away
- 1314 Kings HwyJul 20, 202675' 1x6x8 cedar side by side · 61 m away
- 1311 Kings HwyJan 16, 2026Replace (1) hvac system · 128 m away
- 823 N Edgefield AveNov 12, 2026Nsfaa-build a new front-entry landing and steps over the existing concrete steps. no demolition is included; the concrete steps will remain.the overall structure will be 12 feet wide by 8 feet deep, with an 8-foot-wide by 4-foot-deep landing and four steps at the front and left side. each step will have a 12-inch tread depth and a 6½-inch riser height.work includes added framing and structural support, trex select composite stair treads, handrails, guards, and hardwired lighting for visibility.conservation district approval has been received. all work will follow the submitted architectural plans and conservation district approval · 128 m away
- 828 N Edgefield AveDec 21, 2020Sewer relay · 135 m away
- 1303 Kings HwyDec 8, 2020Detached carport; cd20091401 · 138 m away
- 818 N Windomere AveDec 15, 2025Installing 5 total pilings (5 breakouts) · 147 m away
- 802 N Windomere AveJun 17, 2026Nsfaa expanding outside porch on property. adding wood decking over exiting porch · 151 m away