828 N Edgefield Ave
Dallas, TX 75208
828 N Edgefield Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 828 N Edgefield Ave, Dallas, TX 75208. The most recent, filed December 21, 2020, covers: “Sewer relay”.
Compiled from City of Dallas records · updated Dec 21, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Dec 21, 2020
- since Dec 21, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 828 N Edgefield Ave
What is being built at 828 N Edgefield Ave?
The latest filing (City of Dallas permit 2012213033, December 21, 2020) covers sewer relay.
How many permits and filings does 828 N Edgefield Ave have?
1 filing across 1 project, from December 21, 2020 to December 21, 2020.
Is there other construction near 828 N Edgefield Ave?
Yes. Nearby filings include 823 N Edgefield Ave (nsfaa-build a new front-entry landing and steps over the existing concrete steps. no demolition is included; the concrete steps will remain.the overall structure will be 12 feet wide by 8 feet deep, with an 8-foot-wide by 4-foot-deep landing and four steps at the front and left side. each step will have a 12-inch tread depth and a 6½-inch riser height.work includes added framing and structural support, trex select composite stair treads, handrails, guards, and hardwired lighting for visibility.conservation district approval has been received. all work will follow the submitted architectural plans and conservation district approval, Nov 12, 2026); 902 N Edgefield Ave (resetting/re-shimming the entire pier and beam portion of the foundation with steel to improve leveling.install 6 total pilings (2 exterior, 4 via the crawlspace), Nov 26, 2025); 926 N Edgefield Ave (moving sink locationgas repair, gas test, Sep 25, 2025).
How do I get alerts for new permits at 828 N Edgefield Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 823 N Edgefield AveNov 12, 2026Nsfaa-build a new front-entry landing and steps over the existing concrete steps. no demolition is included; the concrete steps will remain.the overall structure will be 12 feet wide by 8 feet deep, with an 8-foot-wide by 4-foot-deep landing and four steps at the front and left side. each step will have a 12-inch tread depth and a 6½-inch riser height.work includes added framing and structural support, trex select composite stair treads, handrails, guards, and hardwired lighting for visibility.conservation district approval has been received. all work will follow the submitted architectural plans and conservation district approval · 13 m away
- 902 N Edgefield AveNov 26, 2025Resetting/re-shimming the entire pier and beam portion of the foundation with steel to improve leveling.install 6 total pilings (2 exterior, 4 via the crawlspace) · 22 m away
- 926 N Edgefield AveSep 25, 2025Moving sink locationgas repair, gas test · 59 m away
- 939 N Edgefield AveFeb 2, 2026Just need to get power turned on to access and clean the space · 79 m away
- 1331 Kings HwyJan 28, 2021Remove & replace 4x9 sidewalk and approach modify approach · 110 m away
- 919 N Clinton AveMay 19, 2025Excavation to create space in crawlspace, reshim · 116 m away
- 843 N Clinton AveNov 25, 2025Gas test · 116 m away
- 900 N Clinton AveNov 21, 2025900 n clinton remove rotten wood to stabilize foundation · 120 m away
- 925 N Clinton AveNov 12, 2026Electrical work for swimming pool · 120 m away
- 1401 Kings HwySep 24, 2025Plumbing for kitchen and bathroom · 122 m away
- 1415 Kings HwyApr 30, 2026Gas test · 122 m away
- 846 N Clinton AveSep 17, 2025Replace 40 gallon water heater · 123 m away