900 N Clinton Ave
Dallas, TX 75208
Foundation stabilization work at 900 N Clinton Ave
A residential foundation repair was permitted at 900 N Clinton Ave on November 21, 2025. The permit describes removing rotten wood to stabilize the foundation.
Summarized from City of Dallas records · updated Nov 21, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 21, 2025
- since Nov 21, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 900 N Clinton Ave
What work is being done at 900 N Clinton Ave?
A City of Dallas permit describes removing rotten wood to stabilize the foundation. The work is classified as residential foundation repair.
When was the foundation repair permitted?
The permit was filed on November 21, 2025.
What is the permit number for 900 N Clinton Ave?
The City of Dallas permit number is RES-FDN-25-000701. It was filed on November 21, 2025.
Is a new home being built at 900 N Clinton Ave?
The available permit record describes foundation repair, not new-home construction.
What does the foundation repair involve?
The permit description says rotten wood will be removed to stabilize the foundation. It does not provide a square-footage or valuation figure.
Also being built nearby
All of 75208- 919 N Clinton AveMay 19, 2025Excavation to create space in crawlspace, reshim · 30 m away
- 925 N Clinton AveNov 12, 2026Electrical work for swimming pool · 39 m away
- 934 N Clinton AveFeb 20, 2026Service upgrade · 52 m away
- 935 N Clinton AveMay 21, 2025Lower meterbase, raise overhead riser, and install disconnecting means · 54 m away
- 938 N Clinton AveMar 30, 2026Add additional gas line to supply gas for pool heater (40' run) with test · 58 m away
- 939 N Clinton AveMar 19, 2026Remove and replace asphalt shingles, no structural changes · 60 m away
- 846 N Clinton AveSep 17, 2025Replace 40 gallon water heater · 60 m away
- 844 N Clinton AveDec 1, 2025Install tankless water heater · 62 m away
- 842 N Clinton AveAug 4, 2025Plumbing · 63 m away
- 838 N Clinton AveDec 31, 2020Install fence · 67 m away
- 830 N Clinton AveFeb 17, 2026Reroof existing roof and remove all layers during take-off to install new shingles of a similar or exact color. roof size will not change and layout will remain the same · 74 m away
- 843 N Clinton AveNov 25, 2025Gas test · 75 m away