939 N Clinton Ave
Dallas, TX 75208
Asphalt shingle roof replacement at 939 N Clinton Ave
A residential permit covers removing and replacing asphalt shingles at 939 N Clinton Ave in Dallas. The City of Dallas issued the permit on March 19, 2026; the record specifies no structural changes.
Summarized from City of Dallas records · updated Mar 19, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 19, 2026
- since Mar 19, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 939 N Clinton Ave
What is happening at 939 N Clinton Ave in Dallas?
A City of Dallas permit covers removing and replacing the home's asphalt shingles. The permit was filed on March 19, 2026.
Is a new home being built at 939 N Clinton Ave?
The permit record describes roof replacement, not new home construction. It specifies no structural changes.
What kind of roof work is permitted at 939 N Clinton Ave?
The permit covers removing and replacing asphalt shingles. It does not list structural changes.
When was the roofing permit filed for 939 N Clinton Ave?
The City of Dallas record is dated March 19, 2026.
What is the permit number for the roof replacement at 939 N Clinton Ave?
The permit number is RES-ROOF-26-000340. The record describes removal and replacement of asphalt shingles, with no structural changes.
Also being built nearby
All of 75208- 935 N Clinton AveMay 21, 2025Lower meterbase, raise overhead riser, and install disconnecting means · 6 m away
- 938 N Clinton AveMar 30, 2026Add additional gas line to supply gas for pool heater (40' run) with test · 13 m away
- 934 N Clinton AveFeb 20, 2026Service upgrade · 14 m away
- 925 N Clinton AveNov 12, 2026Electrical work for swimming pool · 21 m away
- 919 N Clinton AveMay 19, 2025Excavation to create space in crawlspace, reshim · 31 m away
- 900 N Clinton AveNov 21, 2025900 n clinton remove rotten wood to stabilize foundation · 60 m away
- 926 N Edgefield AveSep 25, 2025Moving sink locationgas repair, gas test · 105 m away
- 939 N Edgefield AveFeb 2, 2026Just need to get power turned on to access and clean the space · 116 m away
- 902 N Edgefield AveNov 26, 2025Resetting/re-shimming the entire pier and beam portion of the foundation with steel to improve leveling.install 6 total pilings (2 exterior, 4 via the crawlspace) · 118 m away
- 921 N Winnetka AveSep 25, 2020Replace or modify existing hvac · 119 m away
- 846 N Clinton AveSep 17, 2025Replace 40 gallon water heater · 119 m away
- 844 N Clinton AveDec 1, 2025Install tankless water heater · 120 m away