902 N Edgefield Ave
Dallas, TX 75208
Foundation repair and HVAC work permitted at 902 N Edgefield Ave
City of Dallas permits at 902 N Edgefield Ave cover residential foundation work and installation of a 3.5-ton gas HVAC unit. The HVAC permit was filed July 25, 2025, and the foundation repair permit was filed November 26, 2025.
Summarized from City of Dallas records · updated Nov 26, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Nov 26, 2025
- since Jul 25, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsResetting/re-shimming the entire pier and beam portion of the foundation with steel to improve leveling.install 6 total pilings (2 exterior, 4 via the crawlspace)
Resetting/re-shimming the entire pier and beam portion of the foundation with steel to improve leveling.install 6 total pilings (2 exterior, 4 via the crawlspace)
City of Dallas permitResidential Foundation Repair
Sources: City of Dallas
Questions about 902 N Edgefield Ave
What work is permitted at 902 N Edgefield Ave in Dallas?
City of Dallas permits cover residential foundation repair and installation of a 3.5-ton gas HVAC unit. The filings are dated July 25 and November 26, 2025.
Is a new house being built at 902 N Edgefield Ave?
The available permits describe work on a residence, not construction of a new house. They cover foundation work and an HVAC unit installation.
What foundation work is planned at 902 N Edgefield Ave?
Permit RES-FDN-25-000719, filed November 26, 2025, describes resetting and re-shimming the pier-and-beam foundation with steel and installing six pilings.
What HVAC unit is being installed at 902 N Edgefield Ave?
Permit RES-MEC-25-001481, filed July 25, 2025, describes a Goodman 3.5-ton gas horizontal unit.
When were permits filed for 902 N Edgefield Ave?
The mechanical permit was filed July 25, 2025, and the foundation repair permit was filed November 26, 2025.
Also being built nearby
All of 75208- 828 N Edgefield AveDec 21, 2020Sewer relay · 22 m away
- 823 N Edgefield AveNov 12, 2026Nsfaa-build a new front-entry landing and steps over the existing concrete steps. no demolition is included; the concrete steps will remain.the overall structure will be 12 feet wide by 8 feet deep, with an 8-foot-wide by 4-foot-deep landing and four steps at the front and left side. each step will have a 12-inch tread depth and a 6½-inch riser height.work includes added framing and structural support, trex select composite stair treads, handrails, guards, and hardwired lighting for visibility.conservation district approval has been received. all work will follow the submitted architectural plans and conservation district approval · 26 m away
- 926 N Edgefield AveSep 25, 2025Moving sink locationgas repair, gas test · 37 m away
- 939 N Edgefield AveFeb 2, 2026Just need to get power turned on to access and clean the space · 57 m away
- 919 N Clinton AveMay 19, 2025Excavation to create space in crawlspace, reshim · 107 m away
- 925 N Clinton AveNov 12, 2026Electrical work for swimming pool · 110 m away
- 935 N Clinton AveMay 21, 2025Lower meterbase, raise overhead riser, and install disconnecting means · 115 m away
- 900 N Clinton AveNov 21, 2025900 n clinton remove rotten wood to stabilize foundation · 117 m away
- 939 N Clinton AveMar 19, 2026Remove and replace asphalt shingles, no structural changes · 118 m away
- 843 N Clinton AveNov 25, 2025Gas test · 127 m away
- 934 N Clinton AveFeb 20, 2026Service upgrade · 127 m away
- 938 N Clinton AveMar 30, 2026Add additional gas line to supply gas for pool heater (40' run) with test · 130 m away