919 N Clinton Ave
Dallas, TX 75208
919 N Clinton Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 919 N Clinton Ave, Dallas, TX 75208. The most recent, filed May 19, 2025, covers: “Excavation to create space in crawlspace, reshim”.
Compiled from City of Dallas records · updated May 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 19, 2025
- since May 19, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 919 N Clinton Ave
What is being built at 919 N Clinton Ave?
The latest filing (City of Dallas permit RES-FDN-25-000018, May 19, 2025) covers excavation to create space in crawlspace, reshim.
How many permits and filings does 919 N Clinton Ave have?
1 filing across 1 project, from May 19, 2025 to May 19, 2025.
Is there other construction near 919 N Clinton Ave?
Yes. Nearby filings include 925 N Clinton Ave (electrical work for swimming pool, Nov 12, 2026); 935 N Clinton Ave (lower meterbase, raise overhead riser, and install disconnecting means, May 21, 2025); 934 N Clinton Ave (service upgrade, Feb 20, 2026).
How do I get alerts for new permits at 919 N Clinton Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 925 N Clinton AveNov 12, 2026Electrical work for swimming pool · 9 m away
- 935 N Clinton AveMay 21, 2025Lower meterbase, raise overhead riser, and install disconnecting means · 25 m away
- 934 N Clinton AveFeb 20, 2026Service upgrade · 28 m away
- 900 N Clinton AveNov 21, 2025900 n clinton remove rotten wood to stabilize foundation · 30 m away
- 939 N Clinton AveMar 19, 2026Remove and replace asphalt shingles, no structural changes · 31 m away
- 938 N Clinton AveMar 30, 2026Add additional gas line to supply gas for pool heater (40' run) with test · 33 m away
- 846 N Clinton AveSep 17, 2025Replace 40 gallon water heater · 88 m away
- 844 N Clinton AveDec 1, 2025Install tankless water heater · 90 m away
- 842 N Clinton AveAug 4, 2025Plumbing · 92 m away
- 838 N Clinton AveDec 31, 2020Install fence · 95 m away
- 843 N Clinton AveNov 25, 2025Gas test · 101 m away
- 830 N Clinton AveFeb 17, 2026Reroof existing roof and remove all layers during take-off to install new shingles of a similar or exact color. roof size will not change and layout will remain the same · 102 m away