846 N Clinton Ave
Dallas, TX 75208
846 N Clinton Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 846 N Clinton Ave, Dallas, TX 75208. The most recent, filed September 17, 2025, covers: “Replace 40 gallon water heater”.
Compiled from City of Dallas records · updated Sep 17, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 17, 2025
- since Sep 17, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 846 N Clinton Ave
What is being built at 846 N Clinton Ave?
The latest filing (City of Dallas permit RES-PLM-25-005003, September 17, 2025) covers replace 40 gallon water heater.
How many permits and filings does 846 N Clinton Ave have?
1 filing across 1 project, from September 17, 2025 to September 17, 2025.
Is there other construction near 846 N Clinton Ave?
Yes. Nearby filings include 844 N Clinton Ave (install tankless water heater, Dec 1, 2025); 842 N Clinton Ave (plumbing, Aug 4, 2025); 838 N Clinton Ave (install fence, Dec 31, 2020).
How do I get alerts for new permits at 846 N Clinton Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 844 N Clinton AveDec 1, 2025Install tankless water heater · 2 m away
- 842 N Clinton AveAug 4, 2025Plumbing · 4 m away
- 838 N Clinton AveDec 31, 2020Install fence · 7 m away
- 830 N Clinton AveFeb 17, 2026Reroof existing roof and remove all layers during take-off to install new shingles of a similar or exact color. roof size will not change and layout will remain the same · 14 m away
- 826 N Clinton AveJun 24, 2025Gas test only · 18 m away
- 843 N Clinton AveNov 25, 2025Gas test · 19 m away
- 829 N Clinton AveJul 30, 2026Air conditioning and heating adding a mini split to new room · 32 m away
- 900 N Clinton AveNov 21, 2025900 n clinton remove rotten wood to stabilize foundation · 60 m away
- 919 N Clinton AveMay 19, 2025Excavation to create space in crawlspace, reshim · 88 m away
- 925 N Clinton AveNov 12, 2026Electrical work for swimming pool · 97 m away
- 934 N Clinton AveFeb 20, 2026Service upgrade · 112 m away
- 935 N Clinton AveMay 21, 2025Lower meterbase, raise overhead riser, and install disconnecting means · 113 m away