939 N Edgefield Ave
Dallas, TX 75208
Electrical permit to turn on power at 939 N Edgefield Ave
A commercial electrical permit indicates power will be turned on so the space can be accessed and cleaned at 939 N Edgefield Ave. The City of Dallas permit was filed February 2, 2026, under permit COM-ELC-26-000431.
Summarized from City of Dallas records · updated Feb 2, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 2, 2026
- since Feb 2, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 939 N Edgefield Ave
What is being built at 939 N Edgefield Ave?
The City of Dallas record does not describe new construction. It is a commercial electrical permit to turn on power so the space can be accessed and cleaned.
What work is planned at 939 N Edgefield Ave?
The permit description says power needs to be turned on to access and clean the space. The permit was filed February 2, 2026, as COM-ELC-26-000431.
Is a new business opening at 939 N Edgefield Ave?
The permit record does not identify a business or provide an opening date. It only describes turning on power to access and clean the space.
When was the permit filed for 939 N Edgefield Ave?
The City of Dallas filed commercial electrical permit COM-ELC-26-000431 on February 2, 2026.
How much will the work at 939 N Edgefield Ave cost?
The record does not report a project valuation or cost estimate.
Also being built nearby
All of 75208- 926 N Edgefield AveSep 25, 2025Moving sink locationgas repair, gas test · 23 m away
- 902 N Edgefield AveNov 26, 2025Resetting/re-shimming the entire pier and beam portion of the foundation with steel to improve leveling.install 6 total pilings (2 exterior, 4 via the crawlspace) · 57 m away
- 823 N Edgefield AveNov 12, 2026Nsfaa-build a new front-entry landing and steps over the existing concrete steps. no demolition is included; the concrete steps will remain.the overall structure will be 12 feet wide by 8 feet deep, with an 8-foot-wide by 4-foot-deep landing and four steps at the front and left side. each step will have a 12-inch tread depth and a 6½-inch riser height.work includes added framing and structural support, trex select composite stair treads, handrails, guards, and hardwired lighting for visibility.conservation district approval has been received. all work will follow the submitted architectural plans and conservation district approval · 77 m away
- 828 N Edgefield AveDec 21, 2020Sewer relay · 79 m away
- 922 N Windomere AveJan 11, 2021Service release no work · 107 m away
- 932 N Windomere AveFeb 17, 2026Re-roof replacement. remove old composition shingles, dispose and haul away. install owens corning duration composition shingles, color - terra cotta · 109 m away
- 944 N Windomere AveDec 7, 2020Service release no work · 113 m away
- 948 N Windomere AveAug 18, 2025Install 40 gallon gas water heater and repair on gas line · 114 m away
- 952 N Windomere AveDec 1, 2025Gas test and 50 gallon gas water heater · 115 m away
- 939 N Clinton AveMar 19, 2026Remove and replace asphalt shingles, no structural changes · 116 m away
- 935 N Clinton AveMay 21, 2025Lower meterbase, raise overhead riser, and install disconnecting means · 116 m away
- 925 N Clinton AveNov 12, 2026Electrical work for swimming pool · 117 m away