1331 Kings Hwy
Dallas, TX 75208
1331 Kings Hwy: 1 project on record
City of Dallas lists 1 filing across 1 project at 1331 Kings Hwy, Dallas, TX 75208. The most recent, filed January 28, 2021, covers: “Remove & replace 4x9 sidewalk and approach modify approach”.
Compiled from City of Dallas records · updated Jan 28, 2021
- Projects
- 1
- 1 filings
- Latest filing
- Jan 28, 2021
- since Jan 28, 2021
- Largest scope
- —
- Listed value
- $46
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 1331 Kings Hwy
What is being built at 1331 Kings Hwy?
The latest filing (City of Dallas permit 2101066012, January 28, 2021) covers remove & replace 4x9 sidewalk and approach modify approach.
How many permits and filings does 1331 Kings Hwy have?
1 filing across 1 project, from January 28, 2021 to January 28, 2021.
How much is the construction at 1331 Kings Hwy worth?
Permits at this address list about $46 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 1331 Kings Hwy?
Yes. Nearby filings include 1415 Kings Hwy (gas test, Apr 30, 2026); 1401 Kings Hwy (plumbing for kitchen and bathroom, Sep 24, 2025); 1402 Kings Hwy (put gauge on meter, atmos turned gas off, gas test needed, Oct 22, 2025).
How do I get alerts for new permits at 1331 Kings Hwy?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 1415 Kings HwyApr 30, 2026Gas test · 25 m away
- 1401 Kings HwySep 24, 2025Plumbing for kitchen and bathroom · 25 m away
- 1402 Kings HwyOct 22, 2025Put gauge on meter, atmos turned gas off, gas test needed · 35 m away
- 1423 Kings HwyOct 7, 2025Hvac replacement · 37 m away
- 1314 Kings HwyJul 20, 202675' 1x6x8 cedar side by side · 45 m away
- 1324 Kings HwyOct 9, 2025Unit #3 gas test · 52 m away
- 1311 Kings HwyJan 16, 2026Replace (1) hvac system · 104 m away
- 823 N Edgefield AveNov 12, 2026Nsfaa-build a new front-entry landing and steps over the existing concrete steps. no demolition is included; the concrete steps will remain.the overall structure will be 12 feet wide by 8 feet deep, with an 8-foot-wide by 4-foot-deep landing and four steps at the front and left side. each step will have a 12-inch tread depth and a 6½-inch riser height.work includes added framing and structural support, trex select composite stair treads, handrails, guards, and hardwired lighting for visibility.conservation district approval has been received. all work will follow the submitted architectural plans and conservation district approval · 105 m away
- 828 N Edgefield AveDec 21, 2020Sewer relay · 110 m away
- 1303 Kings HwyDec 8, 2020Detached carport; cd20091401 · 114 m away
- 902 N Edgefield AveNov 26, 2025Resetting/re-shimming the entire pier and beam portion of the foundation with steel to improve leveling.install 6 total pilings (2 exterior, 4 via the crawlspace) · 131 m away
- 829 N Clinton AveJul 30, 2026Air conditioning and heating adding a mini split to new room · 160 m away