groundranger
Recent · latest filing Sep 2025Residential

2016 Timbergrove Cir

Dallas, TX 75208

2016 Timbergrove Cir: 2 projects on record

City of Dallas lists 2 filings across 2 projects at 2016 Timbergrove Cir, Dallas, TX 75208. The most recent, filed September 25, 2025, covers: “Hvac replacement”.

Compiled from City of Dallas records · updated Sep 25, 2025

Projects
2
2 filings
Latest filing
Sep 25, 2025
since Sep 25, 2025
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Hvac replacement

    Hvac replacement

    City of Dallas permitResidential Mechanical Permit
    Record
    RES-MEC-25-002790
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Interior / exterior sfd remodel

    Interior / exterior sfd remodel

    City of Dallas permitBuilding (BU) Single Family Renovation
    Record
    1908211138
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 2016 Timbergrove Cir

What is being built at 2016 Timbergrove Cir?

The latest filing (City of Dallas permit RES-MEC-25-002790, September 25, 2025) covers hvac replacement.

How many permits and filings does 2016 Timbergrove Cir have?

2 filings across 2 projects, from September 25, 2025 to September 25, 2025.

Is there other construction near 2016 Timbergrove Cir?

Yes. Nearby filings include 2006 Timbergrove Cir (storm winds caused branch to fall onto power line, damaging riser and meter. these are being replaced. requesting expedited permitting and conditional meter release to get oncor scheduled soon as work is complete. final inspection will be requested immediately upon completion, Sep 5, 2025); 2031 Timbergrove Cir (service upgrade, May 15, 2025); 1730 Timbergrove Cir (nsfaa demolition of the existing exterior split-level deck and replace with a new split-level free-standing deck per architectural and structural plans. the new deck will not attach to the home — it will be independently supported per engineered foundation details. the new deck will be a similar floor plan with some modifications for better useable space.existing deck structure, posts, and footings will be fully demolished and removed or abandoned in place where not conflicting with new construction. new concrete pier footings and pressure-treated posts will be installed per plans and requirements.existing exterior brick skirt will remain for aesthetics only and are not used for structural support of the new deck. new deck framing to consist of pt southern yellow pine girders and joists with simpson strong-tie hardware.new surface to be trex composite decking (gray) with white metal guardrail system installed at open edges. no changes to the house structure, utilities, doors, or foundation. no enclosed space created. work will comply with current building code and all city of dallas inspection requirements, Nov 14, 2025).

How do I get alerts for new permits at 2016 Timbergrove Cir?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 75208
Get alerts for 2016 Timbergrove Cir