Recent · latest filing Sep 2025Residential
938 Mary Cliff Rd
Dallas, TX 75208
3-ton HVAC system replacement at 938 Mary Cliff Rd
A 3-ton HVAC system is being replaced at 938 Mary Cliff Rd. The City of Dallas issued a residential mechanical permit for the work on September 29, 2025.
Summarized from City of Dallas records · updated Sep 29, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 29, 2025
- since Sep 29, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 938 Mary Cliff Rd
What work is permitted at 938 Mary Cliff Rd?
A City of Dallas permit indicates a 3-ton HVAC system replacement. The permit was filed September 29, 2025.
Is a new house being built at 938 Mary Cliff Rd?
The available permit is for replacing a 3-ton HVAC system, not for new home construction.
When was the HVAC permit filed for 938 Mary Cliff Rd?
The residential mechanical permit was filed on September 29, 2025.
What is the permit number for 938 Mary Cliff Rd?
The City of Dallas permit number is RES-MEC-25-002852.
How large is the HVAC system being replaced at 938 Mary Cliff Rd?
The permit description specifies a 3-ton HVAC system.
Also being built nearby
All of 75208- 2031 Timbergrove CirMay 15, 2025Service upgrade · 36 m away
- 2016 Timbergrove CirSep 25, 2025Hvac replacement · 62 m away
- 2006 Timbergrove CirSep 5, 2025Storm winds caused branch to fall onto power line, damaging riser and meter. these are being replaced. requesting expedited permitting and conditional meter release to get oncor scheduled soon as work is complete. final inspection will be requested immediately upon completion · 80 m away
- 1730 Timbergrove CirNov 14, 2025Nsfaa demolition of the existing exterior split-level deck and replace with a new split-level free-standing deck per architectural and structural plans. the new deck will not attach to the home — it will be independently supported per engineered foundation details. the new deck will be a similar floor plan with some modifications for better useable space.existing deck structure, posts, and footings will be fully demolished and removed or abandoned in place where not conflicting with new construction. new concrete pier footings and pressure-treated posts will be installed per plans and requirements.existing exterior brick skirt will remain for aesthetics only and are not used for structural support of the new deck. new deck framing to consist of pt southern yellow pine girders and joists with simpson strong-tie hardware.new surface to be trex composite decking (gray) with white metal guardrail system installed at open edges. no changes to the house structure, utilities, doors, or foundation. no enclosed space created. work will comply with current building code and all city of dallas inspection requirements · 96 m away
- 1631 Kings HwyNov 20, 2025Installation of 14.94kw roof-mounted pv system with 36 modules, 2 inverters & 2 batteries · 111 m away
- 1611 Kings HwyJun 29, 2026Replace existing system with 3.5 ton lennox horizontal gas unit · 140 m away
- 935 N Montclair AveNov 9, 2026Mcr demolition existing retaining wall and replace with a stone and high strength mortar retaining wall per engineer plans and conservation approved plans / certificate · 151 m away
- 1621 Kyle StJul 18, 2025Hvac replacement · 163 m away
- 903 N Montclair AveJul 22, 202512 single press concrete piers with rebar reinforcement1 understructure shimming of existing pier and beam supports to improve floor slopes415.0 ft lineal feet of floor joist29.13 ft lineal feet of sill plate · 170 m away
- 950 N Montclair AveJan 27, 2021Install lawn sprinkler · 180 m away
- 1538 Kings HwyNov 3, 2025Gas test, no repairs · 213 m away
- 1930 Timbergrove CirSep 25, 2026Gas repair on service line · 214 m away