2031 Timbergrove Cir: 1 project on record
City of Dallas lists 1 filing across 1 project at 2031 Timbergrove Cir, Dallas, TX 75208. The most recent, filed May 15, 2025, covers: “Service upgrade”.
Compiled from City of Dallas records · updated May 15, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 15, 2025
- since May 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2031 Timbergrove Cir
What is being built at 2031 Timbergrove Cir?
The latest filing (City of Dallas permit RES-ELC-25-000124, May 15, 2025) covers service upgrade.
How many permits and filings does 2031 Timbergrove Cir have?
1 filing across 1 project, from May 15, 2025 to May 15, 2025.
Is there other construction near 2031 Timbergrove Cir?
Yes. Nearby filings include 2016 Timbergrove Cir (hvac replacement, Sep 25, 2025); 938 Mary Cliff Rd (replace 3-ton hvac system, Sep 29, 2025); 2006 Timbergrove Cir (storm winds caused branch to fall onto power line, damaging riser and meter. these are being replaced. requesting expedited permitting and conditional meter release to get oncor scheduled soon as work is complete. final inspection will be requested immediately upon completion, Sep 5, 2025).
How do I get alerts for new permits at 2031 Timbergrove Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 2016 Timbergrove CirSep 25, 2025Hvac replacement · 26 m away
- 938 Mary Cliff RdSep 29, 2025Replace 3-ton hvac system · 36 m away
- 2006 Timbergrove CirSep 5, 2025Storm winds caused branch to fall onto power line, damaging riser and meter. these are being replaced. requesting expedited permitting and conditional meter release to get oncor scheduled soon as work is complete. final inspection will be requested immediately upon completion · 45 m away
- 1730 Timbergrove CirNov 14, 2025Nsfaa demolition of the existing exterior split-level deck and replace with a new split-level free-standing deck per architectural and structural plans. the new deck will not attach to the home — it will be independently supported per engineered foundation details. the new deck will be a similar floor plan with some modifications for better useable space.existing deck structure, posts, and footings will be fully demolished and removed or abandoned in place where not conflicting with new construction. new concrete pier footings and pressure-treated posts will be installed per plans and requirements.existing exterior brick skirt will remain for aesthetics only and are not used for structural support of the new deck. new deck framing to consist of pt southern yellow pine girders and joists with simpson strong-tie hardware.new surface to be trex composite decking (gray) with white metal guardrail system installed at open edges. no changes to the house structure, utilities, doors, or foundation. no enclosed space created. work will comply with current building code and all city of dallas inspection requirements · 69 m away
- 1631 Kings HwyNov 20, 2025Installation of 14.94kw roof-mounted pv system with 36 modules, 2 inverters & 2 batteries · 135 m away
- 1611 Kings HwyJun 29, 2026Replace existing system with 3.5 ton lennox horizontal gas unit · 166 m away
- 1930 Timbergrove CirSep 25, 2026Gas repair on service line · 179 m away
- 935 N Montclair AveNov 9, 2026Mcr demolition existing retaining wall and replace with a stone and high strength mortar retaining wall per engineer plans and conservation approved plans / certificate · 184 m away
- 1621 Kyle StJul 18, 2025Hvac replacement · 199 m away
- 950 N Montclair AveJan 27, 2021Install lawn sprinkler · 201 m away
- 903 N Montclair AveJul 22, 202512 single press concrete piers with rebar reinforcement1 understructure shimming of existing pier and beam supports to improve floor slopes415.0 ft lineal feet of floor joist29.13 ft lineal feet of sill plate · 206 m away
- 1919 Timbergrove CirJun 15, 2026Reroof, tear off shingles, install felt and reroof with composition shingles · 208 m away