215 S Oak Cliff Blvd
Dallas, TX 75208
215 S Oak Cliff Blvd: 1 project on record
City of Dallas lists 1 filing across 1 project at 215 S Oak Cliff Blvd, Dallas, TX 75208. The most recent, filed September 24, 2020, covers: “Install roof mounted solar pv system”.
Compiled from City of Dallas records · updated Sep 24, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Sep 24, 2020
- since Sep 24, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 215 S Oak Cliff Blvd
What is being built at 215 S Oak Cliff Blvd?
The latest filing (City of Dallas permit 2009181020, September 24, 2020) covers install roof mounted solar pv system.
How many permits and filings does 215 S Oak Cliff Blvd have?
1 filing across 1 project, from September 24, 2020 to September 24, 2020.
Is there other construction near 215 S Oak Cliff Blvd?
Yes. Nearby filings include 117 S Oak Cliff Blvd (gas test, Nov 15, 2020); 219 S Montreal Ave (gas test, Aug 11, 2025); 311 S Oak Cliff Blvd (gas test, Feb 25, 2026).
How do I get alerts for new permits at 215 S Oak Cliff Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 117 S Oak Cliff BlvdNov 15, 2020Gas test · 107 m away
- 219 S Montreal AveAug 11, 2025Gas test · 110 m away
- 311 S Oak Cliff BlvdFeb 25, 2026Gas test · 114 m away
- 315 S Oak Cliff BlvdDec 3, 2020Remove existing roof and install new roof · 118 m away
- 318 S Oak Cliff BlvdMay 23, 2025Replacing appr 90ft of water service line · 125 m away
- 209 S Marlborough AveJun 18, 2025Addition2410291073 - 209 s marlborough ave - dallas · 130 m away
- 2112 W 10th StSep 19, 2025Gas line connection to unit east · 134 m away
- 206 S Marlborough AveDec 1, 2020Sewer relay · 143 m away
- 301 S Montreal AveNov 19, 2020Remove existing roof and install new roof · 155 m away
- 302 S Marlborough AveNov 14, 2025We are installing a 6ft tall fence. style is board on board with cap and trim. posts will be metal and pickets will be cedar. there is a double swing gate (wooden) that is also shown on the property survey. we are moving the rear fence into the property by half a foot to a foot due to the obstructions of trees there · 178 m away
- 2218 W 10th StAug 4, 2025Adding restroom · 183 m away
- 414 S Oak Cliff BlvdJan 2, 2026Tear off 1 layer of felt paper3 sheets of decking allowance decking perimeter 236 ftinstall synthetic felt install asphalt starter around perimeter of roofice and water barrier in valleysinstall atlas pinnacle pristine class 330 yr manufacture warrantyinstall duraflow on all pipe jacks (2)remove and reinstall new ventspaint all metals and flashing to matchremove all job related debrisclean yard with magnetic nail bar3 year labor warrantyhaul debris · 217 m away
More solar installs in 75208.