219 S Montreal Ave
Dallas, TX 75208
219 S Montreal Ave: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 219 S Montreal Ave, Dallas, TX 75208 since May 14, 2025. The most recent, filed August 11, 2025, covers: “Gas test”.
Compiled from City of Dallas records · updated Aug 11, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Aug 11, 2025
- since May 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 219 S Montreal Ave
What is being built at 219 S Montreal Ave?
The latest filing (City of Dallas permit RES-PLM-25-003465, August 11, 2025) covers gas test.
How many permits and filings does 219 S Montreal Ave have?
2 filings across 2 projects, from May 14, 2025 to August 11, 2025.
Is there other construction near 219 S Montreal Ave?
Yes. Nearby filings include 301 S Montreal Ave (remove existing roof and install new roof, Nov 19, 2020); 215 S Oak Cliff Blvd (install roof mounted solar pv system, Sep 24, 2020); 2218 W 10th St (adding restroom, Aug 4, 2025).
How do I get alerts for new permits at 219 S Montreal Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 301 S Montreal AveNov 19, 2020Remove existing roof and install new roof · 103 m away
- 215 S Oak Cliff BlvdSep 24, 2020Install roof mounted solar pv system · 110 m away
- 2218 W 10th StAug 4, 2025Adding restroom · 134 m away
- 2112 W 10th StSep 19, 2025Gas line connection to unit east · 151 m away
- 117 S Oak Cliff BlvdNov 15, 2020Gas test · 155 m away
- 311 S Oak Cliff BlvdFeb 25, 2026Gas test · 156 m away
- 315 S Oak Cliff BlvdDec 3, 2020Remove existing roof and install new roof · 159 m away
- 123 Hollywood AveDec 31, 2020Addition to sfd · 162 m away
- 311 Hollywood AveJan 8, 2021Construct new sfd · 165 m away
- 318 S Oak Cliff BlvdMay 23, 2025Replacing appr 90ft of water service line · 183 m away
- 2325 Waddy AveOct 14, 2026Sewer mainline replacement · 198 m away
- 422 S Montreal AveMar 2, 2026Removal of existing fence and installation of approximately 145 linear feet of new 8-foot-tall cedar privacy fence. fence to be constructed with cedar pickets and pressure-treated 2x4 horizontal rails attached to 11-foot steel posts. steel posts to be embedded approximately 3 feet below grade in concrete footings and spaced approximately 6 feet on center. 1 normal size gate on street side and two 6 feet gate near the entrance of the home. concrete footings to provide structural support and stability. fence to be installed within property lines and in compliance with city of dallas zoning and building code requirements · 223 m away