301 S Montreal Ave
Dallas, TX 75208
301 S Montreal Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 301 S Montreal Ave, Dallas, TX 75208. The most recent, filed November 19, 2020, covers: “Remove existing roof and install new roof”.
Compiled from City of Dallas records · updated Nov 19, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Nov 19, 2020
- since Nov 19, 2020
- Largest scope
- —
- Listed value
- $92
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 301 S Montreal Ave
What is being built at 301 S Montreal Ave?
The latest filing (City of Dallas permit 2011195002, November 19, 2020) covers remove existing roof and install new roof.
How many permits and filings does 301 S Montreal Ave have?
1 filing across 1 project, from November 19, 2020 to November 19, 2020.
How much is the construction at 301 S Montreal Ave worth?
Permits at this address list about $92 in valuations. Permit valuations are often partial and understate total project cost.
What is being built near South Oak Cliff Dc in Dallas?
301 S Montreal Ave is about 232 m from South Oak Cliff Dc (314 S Hampton Rd). Its latest filing is for remove existing roof and install new roof.
Is there other construction near 301 S Montreal Ave?
Yes. Nearby filings include 219 S Montreal Ave (gas test, Aug 11, 2025); 311 S Oak Cliff Blvd (gas test, Feb 25, 2026); 315 S Oak Cliff Blvd (remove existing roof and install new roof, Dec 3, 2020).
How do I get alerts for new permits at 301 S Montreal Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 219 S Montreal AveAug 11, 2025Gas test · 103 m away
- 311 S Oak Cliff BlvdFeb 25, 2026Gas test · 114 m away
- 315 S Oak Cliff BlvdDec 3, 2020Remove existing roof and install new roof · 115 m away
- 311 Hollywood AveJan 8, 2021Construct new sfd · 117 m away
- 422 S Montreal AveMar 2, 2026Removal of existing fence and installation of approximately 145 linear feet of new 8-foot-tall cedar privacy fence. fence to be constructed with cedar pickets and pressure-treated 2x4 horizontal rails attached to 11-foot steel posts. steel posts to be embedded approximately 3 feet below grade in concrete footings and spaced approximately 6 feet on center. 1 normal size gate on street side and two 6 feet gate near the entrance of the home. concrete footings to provide structural support and stability. fence to be installed within property lines and in compliance with city of dallas zoning and building code requirements · 121 m away
- 318 S Oak Cliff BlvdMay 23, 2025Replacing appr 90ft of water service line · 144 m away
- 406 Hollywood AveDec 31, 2020Permanent electrical service · 149 m away
- 215 S Oak Cliff BlvdSep 24, 2020Install roof mounted solar pv system · 155 m away
- 414 S Oak Cliff BlvdJan 2, 2026Tear off 1 layer of felt paper3 sheets of decking allowance decking perimeter 236 ftinstall synthetic felt install asphalt starter around perimeter of roofice and water barrier in valleysinstall atlas pinnacle pristine class 330 yr manufacture warrantyinstall duraflow on all pipe jacks (2)remove and reinstall new ventspaint all metals and flashing to matchremove all job related debrisclean yard with magnetic nail bar3 year labor warrantyhaul debris · 179 m away
- 422 S Oak Cliff BlvdMar 4, 2026Gas test to turn on gas with atmos · 184 m away
- 518 S Montreal AveSep 23, 2020Electrical repairs · 227 m away
- 314 S Hampton Rd · South Oak Cliff DcJun 18, 2024South oak cliff dc — renovation/alteration — this project consists of interior of a 11,629 s.f. tenant interior build-out of an existing one story single tenant building shell into a new 36 chair outpatient dialysis clinic. the clinic will also include clinic support spaces · 232 m away