317 S Clinton Ave
Dallas, TX 75208
Permits indicate a full home renovation at 317 S Clinton Ave
Dallas permit filings from December 18, 2025, through February 26, 2026, indicate a complete renovation of the house at 317 S Clinton Ave. The work described includes updates to the kitchen and bathroom, plumbing, electrical service and wiring, and the HVAC system.
Summarized from City of Dallas records · updated Feb 26, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Feb 26, 2026
- since Dec 18, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projects2 full bathrooms kitchen and laundry room run all new pvc and water lines. and test existing gas line
2 full bathrooms kitchen and laundry room run all new pvc and water lines. and test existing gas line
City of Dallas permitResidential Plumbing PermitNsfaa-complete renovation. r&r kitchen cabinetry, tops and flooring, all interior doors, trim, cabinet shelving and flooring throughout entire house. rearrange the master bathroom, installation all new plumbing fixtures and water lines. replacing the entire hvac system: furnace, condenser, ductwork, controls and stats. replacing all of the existing electrical system: home runs, switches, receptacles, and light fixtures
Nsfaa-complete renovation. r&r kitchen cabinetry, tops and flooring, all interior doors, trim, cabinet shelving and flooring throughout entire house. rearrange the master bathroom, installation all new plumbing fixtures and water lines. replacing the entire hvac system: furnace, condenser, ductwork, controls and stats. replacing all of the existing electrical system: home runs, switches, receptacles, and light fixtures
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 317 S Clinton Ave
What is being built at 317 S Clinton Ave in Dallas?
City of Dallas permits indicate a renovation of a house, not a new building. The filings describe work on the kitchen, bathroom, plumbing, electrical system, and HVAC.
Is 317 S Clinton Ave getting a full renovation?
The December 18, 2025, residential alteration permit describes a complete renovation, including kitchen updates and replacement of the home's HVAC and electrical systems.
When were permits filed for work at 317 S Clinton Ave?
The earliest listed filing was December 18, 2025, for permit RES-ALT-ADD-25-000948. The latest was February 26, 2026, for plumbing permit RES-PLM-26-002207.
What plumbing work is permitted at 317 S Clinton Ave?
Permit RES-PLM-26-002207, filed February 26, 2026, describes new PVC and water lines for two full bathrooms, the kitchen, and laundry room, along with testing the existing gas line.
Are the electrical and HVAC systems being replaced at 317 S Clinton Ave?
The permit filings describe upgrades to the electrical service and rewiring, plus a new HVAC unit and ductwork. The December 18, 2025, alteration permit also describes replacing the home's electrical and HVAC systems.
Is a restaurant opening at 317 S Clinton Ave?
The listed permits describe residential renovation work at the address, including plumbing, electrical, and HVAC work. They do not identify a restaurant opening.
Also being built nearby
All of 75208- 311 S Clinton AveMay 15, 2026Replace existing hvac system with a lennox 5-ton, 14.3 seer2, 80% afue gas furnace and air conditioner full system · 6 m away
- 215 S Clinton AveNov 18, 2025A complete bathroom lines faucets and connect to main line · 50 m away
- 318 S Edgefield AveDec 2, 2025Pressure test existing gas line · 102 m away
- 426 S Clinton AveOct 16, 2025158 lf of 8' board on board cedar fencing with double trim & 2x6" cap board with galvanized steel posts · 104 m away
- 336 S Edgefield AveApr 3, 2026Foundation repair · 105 m away
- 317 S Edgefield AveNov 13, 2026Installation of a 10.8 kw dc roof-mounted residential photovoltaic system consisting of twenty-four (24) 450-watt solar modules. twelve (12) modules will be installed on the low-slope, south-facing roof of the detached garage, an accessory structure located behind the primary residence and not visible from the street. the remaining twelve (12) modules will be installed on the west-facing roof plane of the primary residence, with the entire array located within the rear fifty percent (50%) of the roof and not visible from the street. all modules will be installed using low-profile, roof-mounted racking generally parallel to the existing roof surfaces. no solar modules are proposed for the front or street-facing portion of the primary residence, and the project will not alter the existing roof form, roofline, or other character-defining architectural features of the residence · 115 m away
- 309 S Edgefield AveMar 20, 2026309 s edgefield reset reshim 1,243sqft and install drainage correction · 115 m away
- 305 S Edgefield AveDec 14, 2020Sewer relay · 115 m away
- 301 S Edgefield AveOct 28, 2020Remove existing roof and install new roof · 116 m away
- 337 S Edgefield AveSep 24, 2025Foundation repair-install 65 steel piers under the home to stabilize the foundation · 117 m away
- 1315 W Jefferson BlvdNov 25, 2020General repair, no structural changes · 121 m away
- 310 S Winnetka AveJun 9, 2025Complete system replacement · 132 m away
More restaurants in 75208.