301 S Edgefield Ave
Dallas, TX 75208
301 S Edgefield Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 301 S Edgefield Ave, Dallas, TX 75208. The most recent, filed October 28, 2020, covers: “Remove existing roof and install new roof”.
Compiled from City of Dallas records · updated Oct 28, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 28, 2020
- since Oct 28, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 301 S Edgefield Ave
What is being built at 301 S Edgefield Ave?
The latest filing (City of Dallas permit 2010281107, October 28, 2020) covers remove existing roof and install new roof.
How many permits and filings does 301 S Edgefield Ave have?
1 filing across 1 project, from October 28, 2020 to October 28, 2020.
Is there other construction near 301 S Edgefield Ave?
Yes. Nearby filings include 305 S Edgefield Ave (sewer relay, Dec 14, 2020); 309 S Edgefield Ave (309 s edgefield reset reshim 1,243sqft and install drainage correction, Mar 20, 2026); 317 S Edgefield Ave (installation of a 10.8 kw dc roof-mounted residential photovoltaic system consisting of twenty-four (24) 450-watt solar modules. twelve (12) modules will be installed on the low-slope, south-facing roof of the detached garage, an accessory structure located behind the primary residence and not visible from the street. the remaining twelve (12) modules will be installed on the west-facing roof plane of the primary residence, with the entire array located within the rear fifty percent (50%) of the roof and not visible from the street. all modules will be installed using low-profile, roof-mounted racking generally parallel to the existing roof surfaces. no solar modules are proposed for the front or street-facing portion of the primary residence, and the project will not alter the existing roof form, roofline, or other character-defining architectural features of the residence, Nov 13, 2026).
How do I get alerts for new permits at 301 S Edgefield Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 305 S Edgefield AveDec 14, 2020Sewer relay · 4 m away
- 309 S Edgefield AveMar 20, 2026309 s edgefield reset reshim 1,243sqft and install drainage correction · 8 m away
- 317 S Edgefield AveNov 13, 2026Installation of a 10.8 kw dc roof-mounted residential photovoltaic system consisting of twenty-four (24) 450-watt solar modules. twelve (12) modules will be installed on the low-slope, south-facing roof of the detached garage, an accessory structure located behind the primary residence and not visible from the street. the remaining twelve (12) modules will be installed on the west-facing roof plane of the primary residence, with the entire array located within the rear fifty percent (50%) of the roof and not visible from the street. all modules will be installed using low-profile, roof-mounted racking generally parallel to the existing roof surfaces. no solar modules are proposed for the front or street-facing portion of the primary residence, and the project will not alter the existing roof form, roofline, or other character-defining architectural features of the residence · 16 m away
- 318 S Edgefield AveDec 2, 2025Pressure test existing gas line · 22 m away
- 337 S Edgefield AveSep 24, 2025Foundation repair-install 65 steel piers under the home to stabilize the foundation · 36 m away
- 336 S Edgefield AveApr 3, 2026Foundation repair · 38 m away
- 226 S Edgefield AveJan 19, 2021Remove existing roof and install new roof · 88 m away
- 209 S Edgefield AveNov 28, 2025Gas test · 105 m away
- 326 S Windomere AveMar 9, 20261948 sq ft reset/reshim · 107 m away
- 206 S Edgefield AveFeb 16, 2026Remove & replace complete roof system · 108 m away
- 311 S Clinton AveMay 15, 2026Replace existing hvac system with a lennox 5-ton, 14.3 seer2, 80% afue gas furnace and air conditioner full system · 115 m away
- 317 S Clinton AveFeb 26, 20262 full bathrooms kitchen and laundry room run all new pvc and water lines. and test existing gas line · 116 m away