336 S Edgefield Ave
Dallas, TX 75208
Residential foundation repair permitted at 336 S Edgefield Ave
A residential foundation repair was permitted at 336 S Edgefield Ave on April 3, 2026. The City of Dallas permit lists the work as foundation repair; it does not provide a project value or square footage.
Summarized from City of Dallas records · updated Apr 3, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 3, 2026
- since Apr 3, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 336 S Edgefield Ave
What work is permitted at 336 S Edgefield Ave?
A City of Dallas permit lists residential foundation repair at the address. The permit was filed April 3, 2026.
When was the foundation repair permit filed?
The City of Dallas filed permit RES-FDN-26-000290 on April 3, 2026.
Is a new home being built at 336 S Edgefield Ave?
The available record describes foundation repair, not construction of a new home.
How much will the foundation repair cost?
The permit record does not list a reported valuation or estimated project cost.
What is being repaired near Dallas Independent School District on S Edgefield Ave?
A residential foundation repair was permitted at 336 S Edgefield Ave, about 178 meters from the Dallas Independent School District address at 501 S Edgefield Ave. The permit was filed April 3, 2026.
Also being built nearby
All of 75208- 337 S Edgefield AveSep 24, 2025Foundation repair-install 65 steel piers under the home to stabilize the foundation · 13 m away
- 318 S Edgefield AveDec 2, 2025Pressure test existing gas line · 18 m away
- 317 S Edgefield AveNov 13, 2026Installation of a 10.8 kw dc roof-mounted residential photovoltaic system consisting of twenty-four (24) 450-watt solar modules. twelve (12) modules will be installed on the low-slope, south-facing roof of the detached garage, an accessory structure located behind the primary residence and not visible from the street. the remaining twelve (12) modules will be installed on the west-facing roof plane of the primary residence, with the entire array located within the rear fifty percent (50%) of the roof and not visible from the street. all modules will be installed using low-profile, roof-mounted racking generally parallel to the existing roof surfaces. no solar modules are proposed for the front or street-facing portion of the primary residence, and the project will not alter the existing roof form, roofline, or other character-defining architectural features of the residence · 24 m away
- 309 S Edgefield AveMar 20, 2026309 s edgefield reset reshim 1,243sqft and install drainage correction · 31 m away
- 305 S Edgefield AveDec 14, 2020Sewer relay · 35 m away
- 301 S Edgefield AveOct 28, 2020Remove existing roof and install new roof · 38 m away
- 317 S Clinton AveFeb 26, 20262 full bathrooms kitchen and laundry room run all new pvc and water lines. and test existing gas line · 105 m away
- 311 S Clinton AveMay 15, 2026Replace existing hvac system with a lennox 5-ton, 14.3 seer2, 80% afue gas furnace and air conditioner full system · 106 m away
- 326 S Windomere AveMar 9, 20261948 sq ft reset/reshim · 116 m away
- 226 S Edgefield AveJan 19, 2021Remove existing roof and install new roof · 123 m away
- 215 S Clinton AveNov 18, 2025A complete bathroom lines faucets and connect to main line · 125 m away
- 426 S Clinton AveOct 16, 2025158 lf of 8' board on board cedar fencing with double trim & 2x6" cap board with galvanized steel posts · 141 m away