435 W Brooklyn Ave
Dallas, TX 75208
Electrical repairs permitted at 435 W Brooklyn Ave
A residential electrical repair is planned at 435 W Brooklyn Ave, including replacement of the meter base and riser conduit and installation of a disconnect and wire entrance conduit. The City of Dallas permit was filed October 7, 2026.
Summarized from City of Dallas records · updated Oct 7, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 7, 2026
- since Oct 7, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectRepairim goin to replace the meter base and the riser conduit and im going to add a discconnectand wire entrance conducctor from meter base above the roof mast
Repairim goin to replace the meter base and the riser conduit and im going to add a discconnectand wire entrance conducctor from meter base above the roof mast
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 435 W Brooklyn Ave
What work is planned at 435 W Brooklyn Ave?
A City of Dallas residential electrical permit describes replacing the meter base and riser conduit and adding a disconnect and wire entrance conduit.
When was the electrical permit filed for 435 W Brooklyn Ave?
The permit was filed October 7, 2026. Its number is RES-ELC-26-006226.
Is a new home being built at 435 W Brooklyn Ave?
The record provided is for a residential electrical repair, not a new-home construction permit.
What is permit RES-ELC-26-006226 for?
It covers residential electrical work at 435 W Brooklyn Ave, including work on the meter base, riser conduit, disconnect, and wire entrance conduit.
What electrical work is planned near Ionna's Dallas 12th St. Charging Hub?
A residential electrical repair was permitted at 435 W Brooklyn Ave, about 263 meters from the charging hub. The permit was filed October 7, 2026.
Also being built nearby
All of 75208- 427 W Brooklyn AveOct 1, 2020Foundation repair · 7 m away
- 440 W Brooklyn AveOct 6, 2025Gas test pressure test for atmos release water heater · 14 m away
- 426 W Brooklyn AveMar 28, 2026Customer is going to have their old panel replaced along with the meter as well outside which is connected to old cloth wiring. that being said the meter and feed through-disconnect will be installed on the side of the house which will then be fed with ser cable to the newly installed panel and surge protector. the new panel will have brand new breakers and the whole service is going to be properly 200amps. grounding will be installed too with two ground rods on the outside of the house below the new meter and disconnect · 14 m away
- 407 W Brooklyn AveDec 9, 20251 bath remodel (tub and valve ,vanity)1 bath water line replacementreplace water service in yard · 24 m away
- 423 W Pembroke AveNov 23, 2025Gas test/ meter release · 96 m away
- 400 W Pembroke AveSep 12, 2025Gas relay test · 106 m away
- 404 W Pembroke AveDec 8, 2025Locked meter - no repairs · 107 m away
- 330 W Pembroke AveOct 23, 2025Backflow install · 114 m away
- 608 S Adams AveNov 12, 2025Install 2 air handlers 2.5 electric with 6 boots and 2 returns it is duplex608-610 adam’s duplex · 162 m away
- 339 W Page AveOct 20, 2020Remove existing roof and install new roof · 172 m away
- 314 W Brooklyn AveFeb 25, 2026Install 50 gallon gas water heater in closet · 177 m away
- 501 W Page AveJan 20, 2026Gas test · 183 m away