400 W Pembroke Ave
Dallas, TX 75208
400 W Pembroke Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 400 W Pembroke Ave, Dallas, TX 75208. The most recent, filed September 12, 2025, covers: “Gas relay test”.
Compiled from City of Dallas records · updated Sep 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 12, 2025
- since Sep 12, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 400 W Pembroke Ave
What is being built at 400 W Pembroke Ave?
The latest filing (City of Dallas permit RES-PLM-25-004879, September 12, 2025) covers gas relay test.
How many permits and filings does 400 W Pembroke Ave have?
1 filing across 1 project, from September 12, 2025 to September 12, 2025.
Is there other construction near 400 W Pembroke Ave?
Yes. Nearby filings include 404 W Pembroke Ave (locked meter - no repairs, Dec 8, 2025); 423 W Pembroke Ave (gas test/ meter release, Nov 23, 2025); 440 W Brooklyn Ave (gas test pressure test for atmos release water heater, Oct 6, 2025).
How do I get alerts for new permits at 400 W Pembroke Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 404 W Pembroke AveDec 8, 2025Locked meter - no repairs · 4 m away
- 423 W Pembroke AveNov 23, 2025Gas test/ meter release · 14 m away
- 440 W Brooklyn AveOct 6, 2025Gas test pressure test for atmos release water heater · 92 m away
- 419 Delaware AveDec 2, 2020Gas test · 94 m away
- 427 Delaware AveJul 31, 2025Remove existing roof and replace with owens corning oakridge (estate gray) · 95 m away
- 330 W Pembroke AveOct 23, 2025Backflow install · 97 m away
- 435 Delaware AveDec 18, 2020Demolition sfd · 96 m away
- 426 W Brooklyn AveMar 28, 2026Customer is going to have their old panel replaced along with the meter as well outside which is connected to old cloth wiring. that being said the meter and feed through-disconnect will be installed on the side of the house which will then be fed with ser cable to the newly installed panel and surge protector. the new panel will have brand new breakers and the whole service is going to be properly 200amps. grounding will be installed too with two ground rods on the outside of the house below the new meter and disconnect · 98 m away
- 435 W Brooklyn AveOct 7, 2026Repairim goin to replace the meter base and the riser conduit and im going to add a discconnectand wire entrance conducctor from meter base above the roof mast · 106 m away
- 427 W Brooklyn AveOct 1, 2020Foundation repair · 109 m away
- 407 W Brooklyn AveDec 9, 20251 bath remodel (tub and valve ,vanity)1 bath water line replacementreplace water service in yard · 118 m away
- 452 Delaware AveJun 10, 2026Cattlemans plumbing will perform a complete gas inspection both inside and outside of the house. according to the homeowner there should be no work required, however if something needs repair, it will be done on the same visit · 153 m away