419 Delaware Ave
Dallas, TX 75208
419 Delaware Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 419 Delaware Ave, Dallas, TX 75208. The most recent, filed December 2, 2020, covers: “Gas test”.
Compiled from City of Dallas records · updated Dec 2, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Dec 2, 2020
- since Dec 2, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 419 Delaware Ave
What is being built at 419 Delaware Ave?
The latest filing (City of Dallas permit 2012023078, December 2, 2020) covers gas test.
How many permits and filings does 419 Delaware Ave have?
1 filing across 1 project, from December 2, 2020 to December 2, 2020.
Is there other construction near 419 Delaware Ave?
Yes. Nearby filings include 427 Delaware Ave (remove existing roof and replace with owens corning oakridge (estate gray), Jul 31, 2025); 435 Delaware Ave (demolition sfd, Dec 18, 2020); 400 W Pembroke Ave (gas relay test, Sep 12, 2025).
How do I get alerts for new permits at 419 Delaware Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 427 Delaware AveJul 31, 2025Remove existing roof and replace with owens corning oakridge (estate gray) · 9 m away
- 435 Delaware AveDec 18, 2020Demolition sfd · 18 m away
- 400 W Pembroke AveSep 12, 2025Gas relay test · 94 m away
- 404 W Pembroke AveDec 8, 2025Locked meter - no repairs · 94 m away
- 423 W Pembroke AveNov 23, 2025Gas test/ meter release · 107 m away
- 452 Delaware AveJun 10, 2026Cattlemans plumbing will perform a complete gas inspection both inside and outside of the house. according to the homeowner there should be no work required, however if something needs repair, it will be done on the same visit · 109 m away
- 449 W Yarmouth StJul 14, 2026Electric service repair/upgrade · 125 m away
- 330 W Pembroke AveOct 23, 2025Backflow install · 135 m away
- 452 W Yarmouth StSep 10, 2025Installation of pv solar system · 139 m away
- 440 W Brooklyn AveOct 6, 2025Gas test pressure test for atmos release water heater · 183 m away
- 426 W Brooklyn AveMar 28, 2026Customer is going to have their old panel replaced along with the meter as well outside which is connected to old cloth wiring. that being said the meter and feed through-disconnect will be installed on the side of the house which will then be fed with ser cable to the newly installed panel and surge protector. the new panel will have brand new breakers and the whole service is going to be properly 200amps. grounding will be installed too with two ground rods on the outside of the house below the new meter and disconnect · 186 m away
- 528 Delaware AveFeb 27, 2026Putting up an 8ft fence on the side · 190 m away