427 Delaware Ave
Dallas, TX 75208
427 Delaware Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 427 Delaware Ave, Dallas, TX 75208. The most recent, filed July 31, 2025, covers: “Remove existing roof and replace with owens corning oakridge (estate gray)”.
Compiled from City of Dallas records · updated Jul 31, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 31, 2025
- since Jul 31, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 427 Delaware Ave
What is being built at 427 Delaware Ave?
The latest filing (City of Dallas permit RES-ROOF-25-000614, July 31, 2025) covers remove existing roof and replace with owens corning oakridge (estate gray).
How many permits and filings does 427 Delaware Ave have?
1 filing across 1 project, from July 31, 2025 to July 31, 2025.
Is there other construction near 427 Delaware Ave?
Yes. Nearby filings include 435 Delaware Ave (demolition sfd, Dec 18, 2020); 419 Delaware Ave (gas test, Dec 2, 2020); 404 W Pembroke Ave (locked meter - no repairs, Dec 8, 2025).
How do I get alerts for new permits at 427 Delaware Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 435 Delaware AveDec 18, 2020Demolition sfd · 9 m away
- 419 Delaware AveDec 2, 2020Gas test · 9 m away
- 404 W Pembroke AveDec 8, 2025Locked meter - no repairs · 95 m away
- 400 W Pembroke AveSep 12, 2025Gas relay test · 95 m away
- 452 Delaware AveJun 10, 2026Cattlemans plumbing will perform a complete gas inspection both inside and outside of the house. according to the homeowner there should be no work required, however if something needs repair, it will be done on the same visit · 101 m away
- 423 W Pembroke AveNov 23, 2025Gas test/ meter release · 107 m away
- 449 W Yarmouth StJul 14, 2026Electric service repair/upgrade · 120 m away
- 452 W Yarmouth StSep 10, 2025Installation of pv solar system · 134 m away
- 330 W Pembroke AveOct 23, 2025Backflow install · 142 m away
- 528 Delaware AveFeb 27, 2026Putting up an 8ft fence on the side · 181 m away
- 440 W Brooklyn AveOct 6, 2025Gas test pressure test for atmos release water heater · 185 m away
- 426 W Brooklyn AveMar 28, 2026Customer is going to have their old panel replaced along with the meter as well outside which is connected to old cloth wiring. that being said the meter and feed through-disconnect will be installed on the side of the house which will then be fed with ser cable to the newly installed panel and surge protector. the new panel will have brand new breakers and the whole service is going to be properly 200amps. grounding will be installed too with two ground rods on the outside of the house below the new meter and disconnect · 189 m away