435 Delaware Ave
Dallas, TX 75208
435 Delaware Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 435 Delaware Ave, Dallas, TX 75208. The most recent, filed December 18, 2020, covers: “Demolition sfd”.
Compiled from City of Dallas records · updated Dec 18, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Dec 18, 2020
- since Dec 18, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 435 Delaware Ave
What is being built at 435 Delaware Ave?
The latest filing (City of Dallas permit 2010181003, December 18, 2020) covers demolition sfd.
How many permits and filings does 435 Delaware Ave have?
1 filing across 1 project, from December 18, 2020 to December 18, 2020.
Is there other construction near 435 Delaware Ave?
Yes. Nearby filings include 427 Delaware Ave (remove existing roof and replace with owens corning oakridge (estate gray), Jul 31, 2025); 419 Delaware Ave (gas test, Dec 2, 2020); 452 Delaware Ave (cattlemans plumbing will perform a complete gas inspection both inside and outside of the house. according to the homeowner there should be no work required, however if something needs repair, it will be done on the same visit, Jun 10, 2026).
How do I get alerts for new permits at 435 Delaware Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 427 Delaware AveJul 31, 2025Remove existing roof and replace with owens corning oakridge (estate gray) · 9 m away
- 419 Delaware AveDec 2, 2020Gas test · 18 m away
- 452 Delaware AveJun 10, 2026Cattlemans plumbing will perform a complete gas inspection both inside and outside of the house. according to the homeowner there should be no work required, however if something needs repair, it will be done on the same visit · 92 m away
- 404 W Pembroke AveDec 8, 2025Locked meter - no repairs · 96 m away
- 400 W Pembroke AveSep 12, 2025Gas relay test · 96 m away
- 423 W Pembroke AveNov 23, 2025Gas test/ meter release · 108 m away
- 449 W Yarmouth StJul 14, 2026Electric service repair/upgrade · 117 m away
- 452 W Yarmouth StSep 10, 2025Installation of pv solar system · 131 m away
- 330 W Pembroke AveOct 23, 2025Backflow install · 148 m away
- 528 Delaware AveFeb 27, 2026Putting up an 8ft fence on the side · 172 m away
- 440 W Brooklyn AveOct 6, 2025Gas test pressure test for atmos release water heater · 188 m away
- 426 W Brooklyn AveMar 28, 2026Customer is going to have their old panel replaced along with the meter as well outside which is connected to old cloth wiring. that being said the meter and feed through-disconnect will be installed on the side of the house which will then be fed with ser cable to the newly installed panel and surge protector. the new panel will have brand new breakers and the whole service is going to be properly 200amps. grounding will be installed too with two ground rods on the outside of the house below the new meter and disconnect · 192 m away
More demolitions in 75208.