404 W Pembroke Ave
Dallas, TX 75208
Dallas permit records a locked meter, with no repairs
A City of Dallas residential plumbing permit at 404 W Pembroke Ave records a locked meter and no repairs. The permit, RES-PLM-25-008524, was filed on December 8, 2025; the record does not describe new construction.
Summarized from City of Dallas records · updated Dec 8, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 8, 2025
- since Dec 8, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 404 W Pembroke Ave
What is being built at 404 W Pembroke Ave in Dallas?
The permit record does not describe anything being built. It records a residential plumbing permit for a locked meter, with no repairs, filed December 8, 2025.
What does the permit at 404 W Pembroke Ave cover?
City of Dallas permit RES-PLM-25-008524 is described as “Locked meter - no repairs.”
When was the 404 W Pembroke Ave permit filed?
The residential plumbing permit was filed on December 8, 2025.
Is there a new home planned at 404 W Pembroke Ave?
The available permit record does not indicate a new home or other construction. It concerns a locked meter and specifies no repairs.
Is a plumbing repair happening at 404 W Pembroke Ave?
The permit description says “Locked meter - no repairs,” so the record does not indicate plumbing repairs.
Also being built nearby
All of 75208- 400 W Pembroke AveSep 12, 2025Gas relay test · 4 m away
- 423 W Pembroke AveNov 23, 2025Gas test/ meter release · 13 m away
- 440 W Brooklyn AveOct 6, 2025Gas test pressure test for atmos release water heater · 94 m away
- 419 Delaware AveDec 2, 2020Gas test · 94 m away
- 427 Delaware AveJul 31, 2025Remove existing roof and replace with owens corning oakridge (estate gray) · 95 m away
- 435 Delaware AveDec 18, 2020Demolition sfd · 96 m away
- 426 W Brooklyn AveMar 28, 2026Customer is going to have their old panel replaced along with the meter as well outside which is connected to old cloth wiring. that being said the meter and feed through-disconnect will be installed on the side of the house which will then be fed with ser cable to the newly installed panel and surge protector. the new panel will have brand new breakers and the whole service is going to be properly 200amps. grounding will be installed too with two ground rods on the outside of the house below the new meter and disconnect · 100 m away
- 330 W Pembroke AveOct 23, 2025Backflow install · 100 m away
- 435 W Brooklyn AveOct 7, 2026Repairim goin to replace the meter base and the riser conduit and im going to add a discconnectand wire entrance conducctor from meter base above the roof mast · 107 m away
- 427 W Brooklyn AveOct 1, 2020Foundation repair · 111 m away
- 407 W Brooklyn AveDec 9, 20251 bath remodel (tub and valve ,vanity)1 bath water line replacementreplace water service in yard · 120 m away
- 452 Delaware AveJun 10, 2026Cattlemans plumbing will perform a complete gas inspection both inside and outside of the house. according to the homeowner there should be no work required, however if something needs repair, it will be done on the same visit · 151 m away