510 W 10th St
Dallas, TX 75208
Apartment project permits include new HVAC systems
City of Dallas records categorize 510 W 10th St as an apartment project. Permits filed May 6, 2026, cover new heating and air conditioning systems with ductwork; a later permit filed August 23, 2026, covers an 8-foot fence.
Summarized from City of Dallas records · updated Aug 23, 2026
- Projects
- 63
- 63 filings
- Latest filing
- Aug 23, 2026
- since Nov 24, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
63 projects+ 23 older projects. See the full history with a free trial.
Sources: City of Dallas
Questions about 510 W 10th St
What is being built at 510 W 10th St in Dallas?
City of Dallas records categorize the address as an apartment project. Recent permits include new heating and air conditioning systems with ductwork.
Are apartments planned at 510 W 10th St, Dallas, TX 75208?
The City of Dallas record category is “apartment project.” The available permits do not provide the number of apartments.
When were permits filed for 510 W 10th St?
The earliest filing in the records is dated November 24, 2025. HVAC permits were filed May 6, 2026, and an 8-foot fence permit followed on August 23, 2026.
What construction work is permitted at 510 W 10th St?
Permits include installation of new heating and air conditioning systems with ductwork, as well as an 8-foot fence. The fence permit is COM-ACC-26-000033.
How many permits are listed for 510 W 10th St in Dallas?
The City of Dallas data lists 63 permits for the address. Recent records include multiple mechanical permits filed May 6, 2026.
What is the project cost for 510 W 10th St?
The available records do not provide a project cost estimate or reported permit valuation.
Also being built nearby
All of 75208- 502 W 10th StOct 18, 2025Gas test · 14 m away
- 526 W 10th StJan 16, 2026Update service with grounding and surge protection · 27 m away
- 534 W 10th StMay 21, 2026Replacement of existing main electrical panel. no changes to the service or related service equipment will be taking place. the new electrical panel is the same voltage and amperage rating as the existing panel · 41 m away
- 112 N Adams AveNov 26, 2025Install rheem rtex-18 electric tankless water heater in attic (swap out) · 65 m away
- 511 Sunset AveJun 27, 2025Gas final, gas release · 92 m away
- 125 N Adams AveJul 27, 2026Installation of hvac at new construction on suite 209 · 93 m away
- 211 South Adams · Llewelyn Properties LLCJan 23, 2026Energy lane — additions to existing building — additions to an existing building · 116 m away
- 211 S Adams AveAug 3, 2026Plumbing addition · 116 m away
- 504 W 9th StJul 3, 2024New construction of 9 condos · 145 m away
- 508 W 9th StSep 24, 2026Standard review: multifamily townhomes · 146 m away
- 514 W 9th StMay 27, 2026Demolition of primary residential structure with high reach excavator.we will use a water hose for dust control. lot will be left cleared to grade level · 146 m away
- 516 W 9th StNov 4, 2026Multifamily townhomes · 147 m away