504 W 9th St
Dallas, TX 75208
Permit describes 9 new condos at 504 W 9th St
A City of Dallas permit describes new construction of 9 condos at 504 W 9th St. The commercial mechanical permit was filed on July 3, 2024.
Summarized from City of Dallas records · updated Jul 3, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 3, 2024
- since Jul 3, 2024
- Largest scope
- —
- Listed value
- $219K
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 504 W 9th St
What is being built at 504 W 9th St?
A City of Dallas permit describes new construction of 9 condos. The filing is a commercial mechanical permit dated July 3, 2024.
When was the permit filed for 504 W 9th St?
The City of Dallas permit was filed on July 3, 2024.
How many condos are planned at 504 W 9th St?
The permit description specifies new construction of 9 condos.
What type of permit was filed for 504 W 9th St?
The City of Dallas record identifies it as a commercial mechanical permit, filed July 3, 2024.
Is 504 W 9th St near Dallas Independent School District?
Yes. The listed Dallas Independent School District landmark at 201 N Adams Ave is about 14 meters from the address.
What is the reported value of the 504 W 9th St permit?
The permit record reports a value of $219,200. This is the reported value for the permit, not a total project cost.
Also being built nearby
All of 75208- 508 W 9th StSep 24, 2026Standard review: multifamily townhomes · 7 m away
- 201 N Adams Ave · Dallas Independent School DistrictAug 1, 2025Dsst per permit #2406141166 #2406141167 #2406141168 - kitchen plumbing scope: additional 18lft run of sanitary piping and 3 additional drain inlets to match existing conditions.p-101 -revised waste piping and drain layout, based on discovery during field verification-revised and added keynotes for clarification of design intent in various areas.-added fixture tags, pipe tags, and equipment tags for clarification of design intent · 14 m away
- 514 W 9th StMay 27, 2026Demolition of primary residential structure with high reach excavator.we will use a water hose for dust control. lot will be left cleared to grade level · 17 m away
- 516 W 9th StNov 4, 2026Multifamily townhomes · 20 m away
- 522 W 9th StMay 19, 2025Replacing existing roof with gaf timberline hdz complete roofing system · 30 m away
- 125 N Adams AveJul 27, 2026Installation of hvac at new construction on suite 209 · 54 m away
- 112 N Adams AveNov 26, 2025Install rheem rtex-18 electric tankless water heater in attic (swap out) · 89 m away
- 525 Melba StApr 20, 2026New plumbing installtion · 110 m away
- 537 Melba StSep 29, 2026Electrical remodel · 118 m away
- 435 W 9th StOct 16, 2025No work being done. electrical release · 129 m away
- 425 W 9th StJul 1, 2025Meter gas test · 146 m away
- 502 W 10th StOct 18, 2025Gas test · 145 m away