522 W 9th St
Dallas, TX 75208
Roof replacement permitted at 522 W 9th St
A commercial roof replacement was permitted at 522 W 9th St on May 19, 2025. The City of Dallas permit describes replacing the existing roof with a GAF Timberline HDZ Complete roofing system.
Summarized from City of Dallas records · updated May 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 19, 2025
- since May 19, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 522 W 9th St
What is being built at 522 W 9th St in Dallas?
The City of Dallas issued a commercial roofing permit for replacement of the existing roof. The permit, COM-ROOF-25-000008, was filed May 19, 2025.
Is there a new building planned at 522 W 9th St?
The available permit record is for replacing the existing roof, not for new construction.
When was the roof replacement permitted at 522 W 9th St?
The permit was filed on May 19, 2025.
What roofing system is planned for 522 W 9th St?
The permit description specifies a GAF Timberline HDZ Complete roofing system.
What is permit COM-ROOF-25-000008 for in Dallas?
It is a City of Dallas commercial roofing permit for replacing the existing roof at 522 W 9th St with a GAF Timberline HDZ Complete roofing system.
Also being built nearby
All of 75208- 516 W 9th StNov 4, 2026Multifamily townhomes · 10 m away
- 514 W 9th StMay 27, 2026Demolition of primary residential structure with high reach excavator.we will use a water hose for dust control. lot will be left cleared to grade level · 14 m away
- 508 W 9th StSep 24, 2026Standard review: multifamily townhomes · 24 m away
- 504 W 9th StJul 3, 2024New construction of 9 condos · 30 m away
- 201 N Adams Ave · Dallas Independent School DistrictAug 1, 2025Dsst per permit #2406141166 #2406141167 #2406141168 - kitchen plumbing scope: additional 18lft run of sanitary piping and 3 additional drain inlets to match existing conditions.p-101 -revised waste piping and drain layout, based on discovery during field verification-revised and added keynotes for clarification of design intent in various areas.-added fixture tags, pipe tags, and equipment tags for clarification of design intent · 39 m away
- 125 N Adams AveJul 27, 2026Installation of hvac at new construction on suite 209 · 67 m away
- 112 N Adams AveNov 26, 2025Install rheem rtex-18 electric tankless water heater in attic (swap out) · 102 m away
- 525 Melba StApr 20, 2026New plumbing installtion · 103 m away
- 537 Melba StSep 29, 2026Electrical remodel · 105 m away
- 604 W 9th StNov 4, 2020Gas test · 147 m away
- 526 W 10th StJan 16, 2026Update service with grounding and surge protection · 147 m away
- 510 W 10th StAug 23, 2026Installing an 8 foot fence · 148 m away