groundranger
Recent · latest filing Apr 2026Commercial

525 Melba St

Dallas, TX 75208

Permit proposes five four-story condos at 525 Melba St

A City of Dallas permit filed December 18, 2025, describes plans to build five four-story condominiums at 525 Melba St. A separate commercial plumbing permit was filed April 20, 2026; the records do not provide a project cost or construction timeline.

Summarized from City of Dallas records · updated Apr 20, 2026

Projects
3
3 filings
Latest filing
Apr 20, 2026
since Jun 4, 2025
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. New plumbing installtion

    New plumbing installtion

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-001507
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Qteam meeting 8.4.2025 1:30pm to build 5 (4 story) condominiums next to each other on the lot

    Qteam meeting 8.4.2025 1:30pm to build 5 (4 story) condominiums next to each other on the lot

    City of Dallas permitCommercial New Construction Permit
    Record
    COM-NEW-25-000087
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. To reconstruct the sidewalk to update width (5 feet) as per the engineering review, to build the driveway approach with a 5 feet curb return. on the alley side the driveway exit and sidewalk connection will also be accommodated

    To reconstruct the sidewalk to update width (5 feet) as per the engineering review, to build the driveway approach with a 5 feet curb return. on the alley side the driveway exit and sidewalk connection will also be accommodated

    City of Dallas permitCommercial Drive Approach and Sidewalk Permit
    Record
    COM-DSW-25-000007
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 525 Melba St

What is being built at 525 Melba St in Dallas?

A City of Dallas permit filed December 18, 2025, describes plans for five four-story condominiums at the address.

How many condominiums are planned at 525 Melba St?

The December 18, 2025, commercial new construction permit describes five condominiums. It does not specify the number of units.

How tall are the planned condominiums at 525 Melba St?

The permit description says the five condominiums are four stories.

When was the project at 525 Melba St permitted?

The commercial new construction permit, COM-NEW-25-000087, was filed December 18, 2025. A commercial plumbing permit, COM-PLM-26-001507, was filed April 20, 2026.

Is construction underway at 525 Melba St?

The available records include a permit describing plans for five four-story condominiums and a later plumbing permit. They do not confirm whether construction is underway.

What other work was permitted at 525 Melba St?

A June 4, 2025, commercial drive approach and sidewalk permit describes sidewalk reconstruction to a five-foot width and driveway approach work.

Also being built nearby

All of 75208
Get alerts for 525 Melba St