125 N Adams Ave
Dallas, TX 75208
Apartment and townhome project gets HVAC permits
City of Dallas records categorize work at 125 N Adams Ave as an apartment project and townhome development. New-construction HVAC permits for suites 205 through 209 were filed July 27, 2026, after plumbing permits were filed in July.
Summarized from City of Dallas records · updated Jul 27, 2026
- Projects
- 26
- 26 filings
- Latest filing
- Jul 27, 2026
- since Jan 28, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
26 projectsSources: City of Dallas
Questions about 125 N Adams Ave
What is being built at 125 N Adams Ave in Dallas?
City of Dallas records categorize the work as an apartment project and townhome development.
When were permits filed for 125 N Adams Ave?
The records span January 28 through July 27, 2026. The latest filings listed are HVAC permits dated July 27.
What work was permitted at 125 N Adams Ave?
Permits cover HVAC installation for new construction and plumbing work, including top-out and final plumbing.
Which suites at 125 N Adams Ave received HVAC permits?
HVAC permits filed July 27, 2026, cover suites 205, 206, 207, 208 and 209.
What are the permit numbers for the HVAC work at 125 N Adams Ave?
The July 27, 2026, HVAC permits are COM-MEC-26-001852 through COM-MEC-26-001856.
Also being built nearby
All of 75208- 112 N Adams AveNov 26, 2025Install rheem rtex-18 electric tankless water heater in attic (swap out) · 36 m away
- 504 W 9th StJul 3, 2024New construction of 9 condos · 54 m away
- 508 W 9th StSep 24, 2026Standard review: multifamily townhomes · 56 m away
- 514 W 9th StMay 27, 2026Demolition of primary residential structure with high reach excavator.we will use a water hose for dust control. lot will be left cleared to grade level · 60 m away
- 516 W 9th StNov 4, 2026Multifamily townhomes · 62 m away
- 201 N Adams Ave · Dallas Independent School DistrictAug 1, 2025Dsst per permit #2406141166 #2406141167 #2406141168 - kitchen plumbing scope: additional 18lft run of sanitary piping and 3 additional drain inlets to match existing conditions.p-101 -revised waste piping and drain layout, based on discovery during field verification-revised and added keynotes for clarification of design intent in various areas.-added fixture tags, pipe tags, and equipment tags for clarification of design intent · 65 m away
- 522 W 9th StMay 19, 2025Replacing existing roof with gaf timberline hdz complete roofing system · 67 m away
- 502 W 10th StOct 18, 2025Gas test · 91 m away
- 510 W 10th StAug 23, 2026Installing an 8 foot fence · 93 m away
- 526 W 10th StJan 16, 2026Update service with grounding and surge protection · 102 m away
- 534 W 10th StMay 21, 2026Replacement of existing main electrical panel. no changes to the service or related service equipment will be taking place. the new electrical panel is the same voltage and amperage rating as the existing panel · 109 m away
- 435 W 9th StOct 16, 2025No work being done. electrical release · 136 m away